
Service
Home Generator Installation, Service and Repair in San Antonio
Standby and portable hookups wired safe, with a transfer switch done right.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Same day
Appointments available
Flat rate
Approved before work begins
TECL 41806
Licensed and insured
8am to 8pm
Open every day
Electrical emergency? Sparks, burning smell, or a dead panel: call (210) 446-5446 now
Emergency service$49 Off
Your First Service Call
New customers take $49 off their first diagnostic or service call with Wattsmith Electric.
New residential customers only. One per household. Valid on your first service call only. Not combinable with other offers. No cash value. Mention this offer when you book.
Our service guarantees
- We hit your window. Miss it with no heads-up, and that is $149 off.
- You approve one flat price before we touch a wire. No hourly meter.
- We protect your floors, haul our mess, and leave the space clean.
- Everything meets code and we stand behind it, or we come back and fix it.
Wattsmith Electric works to the 2023 National Electrical Code and pulls the permit where one is required. How we handle permits, inspections and the workmanship guarantee is on our standards page. The license, the coverage in force and our federal registrations, including the certificate of insurance process for contractors, are on insurance and licensing.
Why it does not pay to wait
When the grid drops in a Texas storm or freeze, an unprepared home loses heat, refrigeration, medical equipment, and the well pump if you have one. An improper generator hookup is worse: it can backfeed the line and electrocute a lineman. Waiting risks both comfort and a life.
Texas taught everyone a lesson about the grid. When the power drops, you want to flip to backup without dragging cords through a window or backfeeding a line and putting a lineman at risk. That is what a proper transfer switch is for.
We install standby generators on a pad with an automatic transfer switch, or we set up a portable-ready interlock so you can run the essentials safely. Either way it is permitted, code-right, and wired so nobody gets hurt.
What home generator installation includes
- Standby generator installation with automatic transfer switch
- Portable generator interlock kits and inlet boxes
- Manual transfer switch installation
- Dedicated circuits for critical loads
- Gas and pad coordination with your other trades
- Permit and inspection handled
Generator interlock or transfer switch
An interlock kit and a transfer switch solve the same problem: making it physically impossible to connect your home to the generator and the utility at the same time.
An interlock uses your existing panel and every breaker in it. A transfer switch uses a separate enclosure with a fixed set of circuits. Interlock kits are legal in Texas when they are listed for your panel and installed to code; there is no state rule banning them.
Inside San Antonio, the city's electrical permit application carries a line item for generator installations. Texas changed how cities may regulate home backup systems in 2025, so elsewhere we confirm what your city requires.
How we size a home generator
Find out what size standby generator your home needs before you buy one. A licensed electrician comes to the house, lists what you want running in an outage, checks the panel, the service and the gas meter, and recommends the unit and the transfer switch.
We go room by room with you: the air conditioning, the refrigerator and freezer, the well or sump pump, medical equipment, the office, and anything else that has to stay on. That list is what sizes the unit. We look at where the unit can sit and where the gas meter is, so the gas run and the setbacks are known before you get a price.
Generac standby generators we install
Generac rates the Generac Guardian 14kW at 14,000 watts on propane and 14,000 watts on natural gas.
Generac rates the Generac Guardian 18kW at 18,000 watts on propane and 17,000 watts on natural gas.
Generac rates the Generac Guardian 22kW at 22,000 watts on propane and 19,500 watts on natural gas.
Generac rates the Generac Guardian 24kW at 24,000 watts on propane and 21,000 watts on natural gas.
Generac rates the Generac Guardian 26kW at 26,000 watts on propane and 22,500 watts on natural gas.
Which one carries your house depends on your load list, which the sizing visit settles. Generac's specifications are subject to change without notice; each model page links Generac's own spec sheet.
Generator repair and standby generator service
We service and repair standby generators as well as install them. A unit that will not start, will not transfer, or drops out under load usually comes down to a short list on the electrical side: the battery or its charger, the transfer switch, the controller, or the wiring between them. We find which one, quote the repair flat, and fix it.
Home generator maintenance is what keeps a standby unit ready for the outage it was bought for. We check the battery and charger, the transfer switch, and the connections, and tell you plainly what is due and what is not.
Generac generators
- Generac generators in San Antonio
- What a Generac generator costs
- Free Generac sizing visit
- Generac 14kW generator
- Generac 18kW generator
- Generac 22kW generator
- Generac 24kW generator
- Generac 26kW generator
- Generac Service and Maintenance
- Restaurants and Retail
- Medical and Dental Offices
- Offices and Data Closets
- Transfer switch installation
- Generator service and repair
Generators by city
- Generator installation in Alamo Heights
- Generator installation in Stone Oak
- Generator installation in Helotes
- Generator installation in Schertz
- Generator installation in Converse
- Generator installation in Universal City
- Generator installation in Leon Valley
- Generator installation in Boerne
- Generator installation in New Braunfels
- Generator installation in Cibolo
- Generac generators in San Antonio
- Generac generators in New Braunfels
- Generac generators in Boerne
- Generac generators in Fair Oaks Ranch
- Generac generators in Bulverde
- Generac generators in Schertz
- Generac generators in Cibolo
- Generac generators in Seguin
- Generac generators in Floresville
- Generac generators in Castroville
- Generac generators in Universal City
- Generac generators in Helotes
- Generac generators in Stone Oak
- Generac generators in Alamo Heights
- Generac generators in Leon Valley
- Generac generators in Live Oak
- Generac generators in Converse
- Generac generators in Canyon Lake
- Generac generators in Spring Branch
- Generac generators in Garden Ridge
Generac and generator guides
- Generac vs Kohler: Choosing a Home Standby Generator in San Antonio
- Generac Home Standby Cost in San Antonio: What Sets the Price
- Generac Generator Maintenance: What to Check and When
- Generac Generator Sizing for Texas Homes: Loads, Air Conditioners and Load Management
- What Can a Generac 14kW Run? Essential Circuits and Smaller Homes
- What Can a Generac 18kW Run? One Central Air System and the Essentials
- What Can a Generac 22kW Run? The Middle Size and Load Management
- What Can a Generac 24kW Run? Larger Homes and Natural Gas Ratings
- What Can a Generac 26kW Run? Sizing the Largest Guardian for a Texas Home
- Generac 14kW vs 22kW vs 26kW: Comparing Three Guardian Sizes
- How Long Does a Generac Generator Last? What Wears and What Keeps It Running
- Generac Warranty Basics: What to Read Before You Buy
- Generac generator sizes explained: the 14kW, 18kW, 22kW, 24kW and 26kW
- How Loud Is a Generac Generator? Published dB Levels by Size
- Generac Installation Day: What to Expect, Hour by Hour
- Generac Generator Gas Line: Who Runs It, and What It Takes
- Generac Mobile Link: Setup, Alerts and What They Mean
- Generac Air-Cooled vs Liquid-Cooled: Which Fits a Home?
- Generac Maintenance: What a Tune-Up Checks
- Generator Options for San Antonio Homes
- Generator Readiness in Timberwood Park and Bulverde
- Generator Interlock or Transfer Switch: What Texas Allows
- Generator Installation Cost: What a Whole House Generator Takes to Install
- Generator Interlock Kit Installation: How It Works and Why It Is Panel Specific
- Home Battery Backup Installation in San Antonio: With or Without Solar
- What Size Generator for Whole House Backup: How to Size It Right
- Generator Transfer Switch Types: Automatic, Manual and Load Managed
- Commercial Standby Generator Requirements: Emergency, Legally Required and Optional Systems
- Natural Gas vs Propane Standby Generator: Choosing the Fuel for a Texas Home
- What Happens in a Power Outage With a Standby Generator, Step by Step
- Standby generator for a home office: keeping work running through an outage
- Restaurant standby generator: walk-ins, registers and the kitchen line
- Medical office standby generator: exam rooms, cold storage and dental equipment
- Home Standby Generator Permit in Texas: What Changed in 2025
- Winter Storm Uri and Home Backup Power: What the Reports Say
- Standby Generator vs Home Battery: Which Fits Your House?
- Commercial Generator Installation in Dallas: Sizing, Switch and Permit
- Commercial Generator Installation in Fort Worth: Sizing, Switch, Permit, Final
- Standby Generator Sizing for Houston Business: Starting From the Loads That Must Run
- Home Standby Generator Installation Timeline in San Antonio
Signs you need this
- You lose power more than you should and you are done with it
- You run medical equipment or a home office that cannot go dark
- You are backfeeding a portable generator through a dryer cord
- You want whole-home backup without the extension cords
What you can check yourself first
Before you call, here is what you can safely check on your own. Even if you still call us, you will walk in knowing more than you did.
- Decide what has to keep running in an outage: fridge, heat, AC, well pump, medical gear.
- Note whether you have natural gas, propane, or neither. That drives the generator type.
- Find a spot outside, away from windows, where a unit could sit.
- Never run a portable generator into a wall outlet. Ask us about a proper interlock or transfer switch instead.
Straight pricing
Free estimate. We come look at the panel, the load list, and the set location, and give you a fixed price before anything starts.
- Up to three options on a job, each a real way to do it, priced flat. You choose the scope.
- The estimate is free. Nothing is owed until you approve the work.
- The price you approve is the price you pay.
Generator Installation
Generator Installation services
Size your generator
Flat-rate quote before any work starts. A Wattsmith electrician calls you back within 15 minutes during business hours.
Where we work
Generator Installation across the San Antonio metro
We bring generator installation to San Antonio and the surrounding communities. Find your area below or call and we will confirm we cover you.
- Generator Installation, Alamo Heights
- Generator Installation, Stone Oak
- Generator Installation, Helotes
- Generator Installation, Schertz
- Generator Installation, Converse
- Generator Installation, Universal City
- Generator Installation, Leon Valley
- Generator Installation, Boerne
- Generator Installation, New Braunfels
- Generator Installation, Cibolo
We do generator installation across the rest of the metro too, including Live Oak, Selma, Timberwood Park, Hollywood Park, Castle Hills, Windcrest, Kirby, Alamo Ranch, Westover Hills, Medical Center, Bulverde, Fair Oaks Ranch, Terrell Hills, Olmos Park, Shavano Park, Garden Ridge, Spring Branch, Canyon Lake, Seguin, Marion, Saint Hedwig, Adkins, La Vernia, Elmendorf, China Grove, Von Ormy, Somerset, Lytle, Castroville and Floresville.
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
Generac generators
Do you install Generac home standby generators?
Yes. As a Generac Aligned Contractor, we sell and install Generac home standby and commercial generators. We set the unit, wire the automatic transfer switch to your panel, and start it up and test it under load before we leave. The gas line is included in your price, run by a licensed plumber.
Do I need a permit for a standby generator in San Antonio?
Inside San Antonio, the City's electrical permit application covers generators, and we pull the permit and schedule the inspection through Development Services. Texas changed how cities may regulate home backup systems in 2025, and the suburban cities run their own permit offices, so we confirm what your city requires before we write the price.
Every Generac size, the cost guide and the free sizing visit are on our Generac page.
FAQ
Generator Installation questions
Straight answers. If you do not see yours, call us and ask.
Standby or portable, which is right for me?
Standby runs automatically and covers the whole home, at a higher cost. Portable with an interlock covers essentials for less money and some hands-on effort. We size both to your loads and let you choose.
Why can I not just plug a generator into an outlet?
Backfeeding through an outlet energizes your whole panel and can push power onto the grid, which can kill a lineman. It is illegal and dangerous. A transfer switch or interlock isolates you safely.
Do you handle the gas line too?
We wire the electrical and coordinate with a licensed gas fitter for the fuel side. We keep the trades in sync so the install lands on schedule.
Keep exploring
Related work and guides
Related services
Helpful guides
- Generator Interlock Kit Installation: How It Works and Why It Is Panel Specific
- Home Battery Backup Installation in San Antonio: With or Without Solar
- What Size Generator for Whole House Backup: How to Size It Right
- Electrician Referral Program in San Antonio: You Both Get $50
- Generator Installation Cost: What a Whole House Generator Takes to Install
Need generator installation done right?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked