Key takeaways
- Generac calls its remote monitoring Mobile Link; it shows the unit's status on your phone.
- We set it up with you at start-up, on the home Wi-Fi or the connection the model uses.
- An alert is a prompt to look, not always a breakdown. Some clear themselves; some need a service visit.
Generac Mobile Link is how you check on a standby generator without walking out to it. Generac calls its remote monitoring system Mobile Link, and on the units we install it is part of start-up. As a Generac Aligned Contractor, we sell and install Generac home standby and commercial generators. Here is what it does, and what to do when it tells you something.
How does Mobile Link get set up?
At start-up, after the unit has run under load and the transfer test is done, we connect it with you. You install Generac's app, create the account, and we pair the generator. A weak Wi-Fi signal at the side of the house is the usual snag, so tell us on the visit where your router sits.
What does the app show?
- Whether the unit is ready, running or needs attention.
- When it last exercised, and when it will next.
- Whether it is running because of an outage.
- Maintenance reminders at the intervals for your model.
What should I do when an alert comes in?
Read it first. Some alerts are about the connection, not the generator. Others report a condition the unit noticed during its exercise, such as a low battery. Look at the unit's own display, which shows the same message, and check the obvious: is the switch in auto, is the breaker on the unit closed?
If the message names a fault and the unit is not ready, call for service. Do not keep resetting a fault that comes back.
Which alerts usually mean a service visit?
- A fault that stops the unit from being ready.
- A battery warning that returns after a charge.
- Low oil pressure or overcrank messages.
- A maintenance reminder that has come due.
Our guide on what a Generac tune-up checks covers the yearly visit, and Generac generator service and maintenance is how to book it. New installs start on the Generac generators page.
Can more than one person get the alerts?
Yes. Share access with anyone who should know when the generator starts or needs attention, such as a family member nearby or someone who checks the house when you travel. Each person installs the app and signs in to the shared account or is invited to it.
Does the exercise cycle show in the app?
It does. The generator runs itself on a schedule to keep the engine ready, and the app shows when that last happened. A missed exercise is worth a look, because it can mean the unit was not ready to run.
What if the Wi-Fi changes?
A new router or a new password breaks the link until the generator is reconnected. It does not stop the generator from working; it only stops the app from seeing it. Reconnect it from the app, or we can do it on the next service visit.
Does Mobile Link change how the generator works?
No. The generator and the transfer switch run on their own whether the app is connected or not. Mobile Link is a window onto the unit. Generac installation day covers start-up, and the free Generac sizing visit is where a new install starts. Details are on Generac generator installation and the Generac generator cost guide.