Skip to content
Wattsmith Electric
Texas hill country: rolling limestone hills and live oaks above a river valley

Medina County

Electrician in Castroville, TX

Licensed electrical service for Castroville, quoted flat before we start.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Same day

Appointments available

Flat rate

Approved before work begins

TECL 41806

Licensed and insured

8am to 8pm

Open every day

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Castroville sits on US 90 where it crosses the Medina River, west of San Antonio. It is one of the oldest towns in the area, founded by Alsatian settlers, and the historic core around Houston Square and the Landmark Inn is the real thing rather than a theme. Castroville Regional Park runs along the river.

Historic homes downtown, newer construction filling in around them. The old ones need rewires and panel work that respects the structure; the new ones need modern capacity. It is the same two-speed town we work in at Lytle down IH-35, and the newer half looks like Alamo Ranch back east.

On the ground

What Castroville actually needs

  • Genuinely historic structures

    Some of these buildings predate electrical service entirely, which means every circuit in them was added by somebody, sometime, to some standard. We survey before we quote and we work in a way that does not damage what makes the place worth keeping.

  • The Medina River and the low ground

    River-adjacent property means proper GFCI protection and a real look at where the panel and the grounding electrode sit.

  • Not a CPS Energy address

    Out here the provider is generally a cooperative rather than the San Antonio municipal utility, which changes how a new service is applied for and how long the connection takes. We confirm it for your address before we give you a date.

Electrical services in Castroville

The full range of Wattsmith work, available across Castroville. Click any service for the details.

Standby power: Generac generator installation Castroville, with every installed price in the Generac generator cost guide.

Local and ready

Whatever your Castroville home or business needs, we quote it flat and do it right. Call today.

The Wattsmith Standard

How we do the work

Four things we do on every job, and what happens when we miss one.

The Wattsmith On-Time Promise

We show up in the window we give you. If something moves it, you hear it from us first, with a reason. Miss the window with no heads-up, and your diagnostic fee is on us.

Flat rate before work starts

You get the price up front and you approve it before we touch a wire. No hourly meter running while you watch.

Clean job site

We protect your floors, haul our mess, and leave the space the way we found it. You should not be able to tell we were there, except the work is done right.

Code-right, or we make it right

Everything we install meets code and we stand behind it. If it is not right, we come back and fix it. That is the whole deal.

FAQ

Castroville electrical questions

Straight answers. If you do not see yours, call us and ask.

Do you charge extra to come out to Castroville?

No trip-charge games. Castroville is inside our service area, so you get straight flat-rate pricing on the work itself, quoted before we start.

Do you offer emergency electrical service in Castroville?

We keep room for urgent calls in Castroville. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.

Every electrical service our San Antonio electricians offer

Need an electrician in Castroville?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote