Skip to content
Wattsmith Electric

Lighting Installation

Recessed lighting installation in San Antonio

Recessed lighting installation by a licensed electrician, TECL 41806: slim LED lights laid out for even light, rated for contact with insulation and set on dimmers, at one flat price before work starts.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Good recessed lighting is mostly layout. Lights spaced too far apart leave dark patches, and lights packed too close waste fixtures and add glare. We plan the spacing to the room and to what happens in it, so a kitchen counter gets direct light and a living room gets an even wash.

Slim LED fixtures need little depth, which suits remodels and ceilings with little room above them. Where insulation touches a fixture we use IC rated lights made for that contact, and we set the lights on dimmers that work with LED.

What recessed lighting installation covers

  • A layout planned for even light
  • Slim LED recessed fixtures
  • IC rated fixtures where insulation touches them
  • Dimmers made for LED lighting
  • Kitchens, living rooms, bedrooms and remodels
  • New switching for the new lights

How recessed lighting installation goes

  1. 1.You tell us the rooms and how you use them, and we plan the layout with you.
  2. 2.The electrician checks the ceiling space, the insulation and the circuit.
  3. 3.You get one flat price for the layout and the installation and approve it before work starts.
  4. 4.The fixtures are installed, wired to their switches and dimmers, and tested, with each ceiling opening cut to the fixture.

A veteran-owned electrician serving San Antonio, including Alamo Heights, Stone Oak and Helotes.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

It depends on the room's size, its ceiling height and how it is used. We lay the lights out so their light overlaps evenly without hot spots, and show you the plan before installing.

Ready for an electrician who does it right?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote