Skip to content
Wattsmith Electric

Generator Installation | Kendall County

Generator Installation in Boerne, TX

Standby and portable hookups wired safe, with a transfer switch done right. Serving Boerne and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

When you need generator installation in Boerne, you want it done once and done right. Straight pricing, clean work, and a warranty that means something.

Boerne is ranch country. Long service runs, well and septic pumps, gates, barns, and shops. We plan power across the whole property, set sub-panels where they belong, and back it all with generator options for when the grid drops.

Every generator installation job in Boerne gets the Wattsmith Standard: on time, flat rate before work starts, a clean job site, and code-right work or we make it right.

What generator installation in Boerne includes

  • Standby generator installation with automatic transfer switch
  • Portable generator interlock kits and inlet boxes
  • Manual transfer switch installation
  • Dedicated circuits for critical loads
  • Gas and pad coordination with your other trades
  • Permit and inspection handled

How does a home standby generator get connected in Boerne?

It starts with a 2025 change in Texas law. Senate Bill 1252 limited what cities may require for home backup systems, but it left a city-owned utility room to set its own installation and inspection rules in its service area, and Boerne runs its own electric utility. So we ask the city and Boerne Utilities what they require before we write your price.

Fuel is the other local question. The city sells natural gas too, and its Utility Services Contract has a line for increasing an existing gas service, sized in BTUs and pressure. A standby unit adds gas load, so the meter and piping get checked against it before the unit is set.

The city's load shed page says arranging backup power during an outage is the customer's job. In Pedernales Electric territory, the cooperative asks you to call when a service change or meter disconnect is needed and requires a UL approved transfer switch.

Straight pricing

Free estimate. We come look at the panel, the load list, and the set location, and give you a fixed price before anything starts.

FAQ

Generator Installation in Boerne, answered

Straight answers. If you do not see yours, call us and ask.

Why can I not just plug a generator into an outlet?

Backfeeding through an outlet energizes your whole panel and can push power onto the grid, which can kill a lineman. It is illegal and dangerous. A transfer switch or interlock isolates you safely.

Can you handle both my home and my rental in Boerne?

Absolutely. We work with homeowners and landlords across Boerne, from a single repair to a full panel upgrade or a turn between tenants.

How fast can you get to Boerne?

For most calls in Boerne we can offer same-day or next-day service during business hours. Call and we will give you the soonest honest window.

Generator Installation in Boerne, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote