Skip to content
Wattsmith Electric

Home and business standby generators, Universal City

Generac generator installation Universal City sized to your loads and tested before we leave

Home and business standby generators in Universal City, sized to what you need running in an outage, installed with an automatic transfer switch and tested under load. Universal City lists two electric providers, CPS Energy and GVEC. Your electric bill shows which one serves your address, and that is the one we coordinate with.

We sell and install Generac home standby and commercial generators.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Working in Universal City

Can a homeowner pull a generator permit in Universal City?

No. Universal City says electrical permits are pulled by a state licensed, city registered contractor, and homeowners cannot pull them. Permits go through the Development Services Department on the SmartGov Portal. The city does not accept registrations from other cities, and lists both CPS Energy and GVEC as electric providers.

A Generac install in Universal City

We list what you want running in an outage, check the panel and the service, and recommend the Generac unit and the transfer switch to match. Then we set the unit, mount and wire the automatic transfer switch, run the wiring between the generator, the switch and your panel, and start it up and test it under load before we leave. For a business, the same sizing and transfer switch work applies at commercial scale.

  • A load list room by room
  • Automatic transfer switch at the service
  • Start up and a transfer test under load

The utility side in Universal City

Universal City lists two electric providers, CPS Energy and GVEC. Your electric bill shows which one serves your address, and that is the one we coordinate with. CPS Energy has a back-up generator application that the electrical contractor completes and submits. It asks for a three-line diagram with conductor sizes and grounding details, the transfer switch specifications showing break before make operation and a service-rated switch, site drawings and a photo of the working clearances. When the work is ready, the contractor notifies CPS Energy, and CPS Energy meets the contractor on site for a final commissioning test. Where CPS Energy asks for it, we prepare that application and arrange the test. GVEC asks members with a backup generator to let it know. Its generator agreement says the generator and transfer switch are installed only by a Texas licensed electrician, outside GVEC's easement and properly grounded, that a transfer switch never goes on a GVEC pole, and that no one installs a meter collar or opens GVEC's meter. The transfer switch goes in after GVEC is notified, so it can arrange a temporary disconnect.

Permits in Universal City

In Universal City, permits go through the Development Services Department on the SmartGov Portal. Electrical permits there are pulled by a state licensed, city registered contractor, and homeowners cannot pull them. We confirm what the city requires before we write the price.

Contractor registration

Universal City requires every contractor working in the city to register, does not accept registrations from other cities, and keeps each registration good for one year from issuance, with a bond or certificate of insurance naming Universal City as certificate holder. The registration is in place before the permit is pulled, so it never holds up a start date.

Natural gas in Universal City

Universal City lists two natural gas providers, CPS Energy and CenterPoint Energy, so the gas supplier depends on the address. Gas line and gas connection are not included. That is a licensed plumber's work and we quote it separately. We coordinate the plumber with the electrical work so the unit is ready to run on the day it is finished.

Questions about generac generator installation in universal city? Call or get a quote.

Generator quote

How do I book a free Generac sizing visit in Universal City?

Tell us what you want to keep running in an outage. We call back to set up the sizing visit.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do people ask about Generac generators in Universal City?

Straight answers. If you do not see yours, call us and ask.

Universal City lists two electric providers, CPS Energy and GVEC. Your electric bill shows which one serves your address, and that is the one we coordinate with.

Call NowGet a Quote