Skip to content
Wattsmith Electric
Downtown San Antonio at sunset, the Tower Life dome and Frost Tower above the interstate

Guadalupe County

Electrician in Schertz, TX

Licensed electrical service for Schertz, quoted flat before we start.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Same day

Appointments available

Flat rate

Approved before work begins

TECL 41806

Licensed and insured

8am to 8pm

Open every day

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Schertz runs along FM 3009 between IH-35 and the Randolph AFB fence line, with Schertz Parkway and the old Main Street holding the original town. It has grown fast enough that the housing stock is genuinely two different cities stacked on one map.

New construction on one end needs EV and generator prep. Older homes near the base need panels and rewires. We cover both, and the pattern is common enough across this corridor that we wrote one guide for Schertz, Cibolo, and Universal City together. Same story next door in Cibolo and Universal City.

Field notes

What we run into in Schertz

  • Two housing eras, one city

    A 2019 build and a 1965 build need opposite things. We do not run a script. We look at what is actually on your wall and quote that.

  • Military families move on a schedule

    Randolph means PCS timelines, and a timeline does not care that the panel needs work. We show up when we say and we finish when we said we would.

  • CPS Energy or GVEC, depending on the address

    Service territory here does not follow the city limit, and Schertz spans more than one county. Depending on the address, power comes from CPS Energy or from GVEC, the Guadalupe Valley Electric Cooperative, which keeps an office in Schertz. We confirm which serves your address before we quote a connection timeline.

  • Permits and inspections through the city

    Inside Schertz, electrical work is permitted and inspected by the city's Inspections team, and contractors register with the city before pulling a permit. We handle both, inside the flat quote.

Electrical services in Schertz

The full range of Wattsmith work, available across Schertz. Click any service for the details.

Standby power: Generac generator installation Schertz, with every installed price in the Generac generator cost guide.

Local and ready

Ready to get it handled in Schertz? Call us for a straight, flat-rate quote.

The Wattsmith Standard

How we do the work

Four things we do on every job, and what happens when we miss one.

The Wattsmith On-Time Promise

We show up in the window we give you. If something moves it, you hear it from us first, with a reason. Miss the window with no heads-up, and your diagnostic fee is on us.

Flat rate before work starts

You get the price up front and you approve it before we touch a wire. No hourly meter running while you watch.

Clean job site

We protect your floors, haul our mess, and leave the space the way we found it. You should not be able to tell we were there, except the work is done right.

Code-right, or we make it right

Everything we install meets code and we stand behind it. If it is not right, we come back and fix it. That is the whole deal.

FAQ

Schertz electrical questions

Straight answers. If you do not see yours, call us and ask.

Are you licensed to work in Schertz?

Yes. We are a licensed and insured Texas electrical contractor and we pull the proper permits for work in Schertz wherever code requires it.

Do you actually service Schertz?

Yes. Schertz is part of our regular San Antonio metro service area. You get the same flat-rate pricing and the same crew that serves the rest of the region.

Every electrical service our San Antonio electricians offer

Need an electrician in Schertz?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote