Skip to content
Wattsmith Electric

Commercial electrical

LED lighting retrofit in San Antonio

LED lighting retrofit by a licensed electrical contractor, TECL 41806: parking lot, warehouse, office and storefront lighting converted to LED, with controls and sensors, to cut what your lighting costs to run and to maintain. One flat price before work starts.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Most of the buildings we retrofit run metal halide, high pressure sodium or fluorescent lighting. Those lamps draw more power for the light they give, lose output as they age, and need a lift or a ladder for every lamp and ballast change. Moving to LED cuts the draw and stretches the time between service calls, which matters most on poles and high ceilings, where every replacement is a small project.

There is more than one way to do it. LED lamps can go into some existing fixtures, either running on the old ballast or wired to bypass it. Retrofit kits replace the inside of a fixture and keep its housing. New fixtures replace the whole thing. We look at the age and condition of what is up there now and recommend the approach that suits how long you plan to keep the building.

What an LED lighting retrofit covers

  • Parking lot pole lights and wall packs
  • Warehouse high bay lighting
  • Office troffers and fluorescent fixtures
  • Storefront and canopy lighting
  • Photocells, timers and occupancy sensors
  • Circuits and controls labeled at the panel

How an LED lighting retrofit goes

  1. 1.You tell us about the building, how it is used and when it is open, and which areas are too dark or cost too much to light.
  2. 2.The electrician surveys the fixtures, the circuits and the controls, and notes any poles, bases or ballasts that need attention.
  3. 3.You get one flat price for the LED lighting retrofit and approve it before work starts.
  4. 4.The work is scheduled around your hours, each area is switched over and tested, and the controls are set so lights run only when they are needed.

A veteran-owned electrician serving San Antonio, including Alamo Heights, Stone Oak and Helotes.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

It depends on the fixtures you have. Sound housings in good condition suit retrofit kits. Damaged or aging fixtures, or a layout that leaves dark spots, are better served by new fixtures. Lamps that bypass the ballast are a quick change, but they keep the old fixture and its wear.

Ready for an electrician who does it right?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote