Skip to content
Wattsmith Electric

Generator Installation | Comal County

Generator Installation in New Braunfels, TX

Standby and portable hookups wired safe, with a transfer switch done right. Serving New Braunfels and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

When you need generator installation in New Braunfels, you want it done once and done right. Straight pricing, clean work, and a warranty that means something.

New Braunfels is booming, and it shows in the work. New construction and additions on one side, historic downtown homes needing careful rewires on the other. We handle both, from rough-in to a delicate old-house panel swap.

From the first call to the final walkthrough, your generator installation in New Braunfels is handled by licensed, insured, background-checked techs who treat your home like their own.

What generator installation in New Braunfels includes

  • Standby generator installation with automatic transfer switch
  • Portable generator interlock kits and inlet boxes
  • Manual transfer switch installation
  • Dedicated circuits for critical loads
  • Gas and pad coordination with your other trades
  • Permit and inspection handled

What has to be settled before a standby generator goes in at a New Braunfels home?

Two things come before the price: what your city and your utility ask of a home backup system. Texas changed that in 2025. Senate Bill 1252 limits what a city may require for a residential backup system, while leaving room for a municipally owned utility to set its own rules in its service area. NBU is the community owned utility that grew out of the city's 1942 purchase of the local electric system, so we confirm with NBU and with the city what applies at your address before we write the quote.

The safety rule does not move. NBU's own safety page warns that a generator must be connected so it cannot backfeed into utility lines, and that is the job of a transfer switch or interlock. On GVEC, its generator agreement says only GVEC opens or removes its meter, and PEC asks members to call before connecting a generator. FEMA declared the February 2021 winter storm a major disaster, DR-4586, for Comal and Guadalupe counties.

Straight pricing

Free estimate. We come look at the panel, the load list, and the set location, and give you a fixed price before anything starts.

FAQ

Generator Installation in New Braunfels, answered

Straight answers. If you do not see yours, call us and ask.

Standby or portable, which is right for me?

Standby runs automatically and covers the whole home, at a higher cost. Portable with an interlock covers essentials for less money and some hands-on effort. We size both to your loads and let you choose.

Do you actually service New Braunfels?

Yes. New Braunfels is part of our regular San Antonio metro service area. You get the same flat-rate pricing and the same crew that serves the rest of the region.

Are you licensed to work in New Braunfels?

Yes. We are a licensed and insured Texas electrical contractor and we pull the proper permits for work in New Braunfels wherever code requires it.

Generator Installation in New Braunfels, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote