Skip to content
Wattsmith Electric

Generator Installation

Transfer switch installation in San Antonio

Transfer switch installation by a licensed electrician, TECL 41806: an interlock kit, inlet box and cord for a portable generator, or an automatic transfer switch for a standby unit, so you run on backup power with no backfeed, at one flat price before work starts.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Every safe generator hookup does one thing: it makes it impossible for the generator and the utility to feed the house at the same time. When both can, generator power travels out through the meter and onto the lines, where it can injure a line worker who believes the line is dead, and the generator can be damaged when the grid comes back. A transfer switch or an interlock keeps the two apart.

Which one fits depends on the generator and how you want to use it. A standby generator gets an automatic transfer switch that senses the outage, starts the unit and moves the load without anyone touching it. A portable generator connects through an inlet box on the outside wall, a cord sized to the generator, and either an interlock on the main panel or a manual transfer switch. Permits are handled where the work needs one.

What transfer switch installation covers

  • Automatic transfer switches for standby generators
  • Manual transfer switches for selected circuits
  • Generator interlock kits listed for your panel
  • Outdoor inlet boxes and generator cords
  • A generator breaker sized to the unit
  • Permits and inspections where required

How a transfer switch installation goes

  1. 1.You tell us about the generator you have or plan to buy, and which circuits matter most in an outage.
  2. 2.The electrician checks the panel's make, model and open spaces, and where the inlet box and the generator will sit.
  3. 3.You get one flat price for the transfer switch or interlock installation and approve it before work starts.
  4. 4.The switch or interlock is installed, the inlet is wired, the work is inspected where required, and we run the system on generator power with you.

Generator interlock installation

An interlock is a plate or slide fitted to the front of the main panel. With it in place, the main breaker and the generator breaker cannot both be on: to turn on the generator breaker, the main has to be off first. It is a simple part, and for many homes it is the most practical way to connect a portable generator.

An interlock has to be made for the panel it goes on. Each kit is listed for particular panel makers and models, because it depends on where the main breaker sits and how the cover is shaped. We check the make and model before quoting, and if no listed kit exists for your panel, we tell you and price a manual transfer switch instead.

With an interlock, you choose what runs. In an outage you start the generator, switch off the main, switch on the generator breaker, then turn on the circuits you need, keeping the total within what the generator can carry. We go through it with you on the day of the installation and label the panel, so the steps are in front of you when the power goes out.

A veteran-owned electrician serving San Antonio, including Alamo Heights, Stone Oak and Helotes.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

Both prevent backfeed. An interlock lets you power any circuit in the panel and is usually the smaller job, but you manage the load by hand. A manual transfer switch limits you to the circuits wired to it, which makes an overload harder. An automatic transfer switch is the choice for a standby generator.

Ready for an electrician who does it right?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote