
Guadalupe County
Electrician in Cibolo, TX
Licensed electrical service for Cibolo, quoted flat before we start.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Same day
Appointments available
Flat rate
Approved before work begins
TECL 41806
Licensed and insured
8am to 8pm
Open every day
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Cibolo sits on FM 1103 between IH-10 and the Schertz line, with Green Valley Road running out through it and Cibolo Creek giving the town its name. It filled up fast with newer family homes, and those families have been adding to them ever since.
Chargers, hot tubs, and generators are the common calls, and they all land on a panel the builder sized for a simpler house. We cover the whole corridor in our Schertz, Cibolo, and Universal City guide. The same growth is happening in Schertz next door and up IH-35 in New Braunfels.
On the ground
What Cibolo actually needs
The builder sized it for the house as sold
Not for the house with a charger, a spa, and a workshop in the garage. We do the load calculation, tell you where you actually stand, and add capacity if you need it.
Hot tubs are a code job, not a patio job
Spa circuits need proper GFCI protection, a disconnect in the right place, and bonding. It is a common corner to cut and a bad one.
Creek-adjacent lots
Cibolo Creek and the low ground near it mean exterior and garage circuits need real protection. We do not treat it as optional.
GVEC, and the 2023 code
The City of Cibolo names the Guadalupe Valley Electric Cooperative, GVEC, as its primary electricity provider, so a new or upgraded service here usually goes through GVEC rather than CPS Energy. Work inside the city is permitted and inspected under the 2023 National Electrical Code, which Cibolo has adopted.
Electrical services in Cibolo
The full range of Wattsmith work, available across Cibolo. Click any service for the details.
- Electrical Repair
- Panel Upgrades
- EV Charger Installation
- Whole Home Rewiring
- Lighting Installation
- Generator Installation
- Surge Protection
- Outlets and GFCI
- Smoke and CO Detectors
- Electrical Inspections
- New Construction Wiring
Standby power: Generac generator installation Cibolo, with every installed price in the Generac generator cost guide.
Local and ready
Ready to get it handled in Cibolo? Call us for a straight, flat-rate quote.
Offers
Flat price offers in Cibolo
Prices from our price book. Your tech confirms the final price on site, and you approve it before any work starts.
- OfferElectrical Troubleshooting$149 covers the first hourSee the offer
- OfferReal Estate Electrical Inspection$563 flat, written report includedSee the offer
- Offer200 Amp Panel UpgradeStarting at $6,039See the offer
- OfferLevel 2 EV Charger InstallationStarting at $1,209See the offer
- OfferGenerator Interlock and InletStarting at $1,789See the offer
- OfferWhole-Home Surge ProtectionStarting at $629See the offer
The Wattsmith Standard
How we do the work
Four things we do on every job, and what happens when we miss one.
The Wattsmith On-Time Promise
We show up in the window we give you. If something moves it, you hear it from us first, with a reason. Miss the window with no heads-up, and your diagnostic fee is on us.
Flat rate before work starts
You get the price up front and you approve it before we touch a wire. No hourly meter running while you watch.
Clean job site
We protect your floors, haul our mess, and leave the space the way we found it. You should not be able to tell we were there, except the work is done right.
Code-right, or we make it right
Everything we install meets code and we stand behind it. If it is not right, we come back and fix it. That is the whole deal.
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Cibolo electrical questions
Straight answers. If you do not see yours, call us and ask.
Do you charge extra to come out to Cibolo?
No trip-charge games. Cibolo is inside our service area, so you get straight flat-rate pricing on the work itself, quoted before we start.
Do you offer emergency electrical service in Cibolo?
We keep room for urgent calls in Cibolo. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.
Every electrical service our San Antonio electricians offer
Local electrical guides
Electrical guides for Cibolo homeowners
Need an electrician in Cibolo?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked
Nearby areas