Skip to content
Wattsmith Electric

Home and business standby generators, San Antonio

Generac generator installation San Antonio sized to your loads and tested before we leave

Home and business standby generators in San Antonio, sized to what you need running in an outage, installed with an automatic transfer switch and tested under load. CPS Energy supplies electricity in San Antonio, and natural gas too.

We sell and install Generac home standby and commercial generators.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Working in San Antonio

Does CPS Energy need to approve a standby generator in San Antonio?

CPS Energy has a back-up generator application that the electrical contractor completes and submits, with a three-line diagram, the transfer switch specifications, site drawings and a photo of the clearances. CPS Energy then meets the contractor on site for a final commissioning test. On the city side, the electrical permit goes through BuildSA.

A Generac install in San Antonio

We list what you want running in an outage, check the panel and the service, and recommend the Generac unit and the transfer switch to match. Then we set the unit, mount and wire the automatic transfer switch, run the wiring between the generator, the switch and your panel, and start it up and test it under load before we leave. For a business, the same sizing and transfer switch work applies at commercial scale.

  • A load list room by room
  • Automatic transfer switch at the service
  • Start up and a transfer test under load

The utility side in San Antonio

CPS Energy supplies electricity in San Antonio, and natural gas too. CPS Energy has a back-up generator application that the electrical contractor completes and submits. It asks for a three-line diagram with conductor sizes and grounding details, the transfer switch specifications showing break before make operation and a service-rated switch, site drawings and a photo of the working clearances. When the work is ready, the contractor notifies CPS Energy, and CPS Energy meets the contractor on site for a final commissioning test. Where CPS Energy asks for it, we prepare that application and arrange the test.

Permits in San Antonio

In San Antonio, permits come from the Development Services Department through the BuildSA portal. The City's electrical permit application covers generators and asks whether the work involves CPS Energy, and inspections are scheduled in BuildSA. We pull the electrical permit and meet the inspector.

Contractor registration

San Antonio requires City and State licensed contractors to be registered with Development Services before permits are issued, and electrical contractors register their state license with the City. The registration is in place before the permit is pulled, so it never holds up a start date.

Natural gas in San Antonio

CPS Energy supplies natural gas in San Antonio as well as electricity, so a natural gas Generac draws its fuel from the same utility. Gas line and gas connection are not included. That is a licensed plumber's work and we quote it separately. We coordinate the plumber with the electrical work so the unit is ready to run on the day it is finished.

Questions about generac generator installation in san antonio? Call or get a quote.

Generator quote

How do I book a free Generac sizing visit in San Antonio?

Tell us what you want to keep running in an outage. We call back to set up the sizing visit.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do people ask about Generac generators in San Antonio?

Straight answers. If you do not see yours, call us and ask.

CPS Energy supplies electricity in San Antonio, and natural gas too.

Call NowGet a Quote