Winter Storm Uri and Home Backup Power: What the Reports Say

November 1, 2026Last updated 7 min readWattsmith Electric · TECL 41806

Key takeaways

  • ERCOT ordered rotating outages at 1:20 a.m. on February 15, 2021, and the last controlled outage orders ended at 12:42 a.m. on February 18.
  • ERCOT reported a peak of 20,000 MW of load shed on February 15, with about 48.6 percent of generation forced out at the highest point.
  • Some homes stayed dark for days because their circuits could not be rotated, and the PUC notes that a critical care designation does not guarantee power.
  • A standby generator starts on its own when the power drops, and the right size comes from a load list made in your house.

Winter Storm Uri is the reason many San Antonio households first asked about home backup power. In February 2021, Texas went through days of rotating outages in temperatures most homes here are not built for. This guide sets out what the Electric Reliability Council of Texas, ERCOT, and the Public Utility Commission of Texas, the PUC, reported afterward, in their own words where it matters, and then what that record means if you are weighing a standby generator now. It does not guess at the next storm. It reads the reports from the last one.

What happened to the Texas grid during Winter Storm Uri?

Generation failed faster than demand could be met. The PUC reports that ERCOT declared its first energy emergency at 12:15 a.m. on February 15, 2021, and by 1:20 a.m. had declared the highest level and ordered firm load shed, carried out by utilities as rotating outages. ERCOT recorded a peak of 20,000 MW of load shed that day.

The PUC's account says consumers started losing service on the evening of February 14, as the cold, wind, ice and snow hit local lines. The controlled outage orders stayed in place until 12:42 a.m. on Thursday, February 18. Even then, the PUC notes, some consumers stayed without power because of storm damage to transmission and distribution lines, and ERCOT did not return to normal operations until 10:35 a.m. on Friday, February 19.

ERCOT's own slides explain why the outages were ordered at all: controlled outages were implemented to prevent a statewide blackout. ERCOT manages power for roughly 26 million Texas customers, and a total collapse of that grid would have taken far longer to restore than a rotation.

Why did so much generation go offline?

ERCOT reported that about 48.6 percent of generation was forced out at the highest point, 52,277 MW out of 107,514 MW of installed capacity. The PUC describes wind turbines that froze and thermal generators that tripped offline because of the weather or limited fuel, and ERCOT named limited gas availability for gas fired power plants.

That is worth reading carefully. The failures crossed fuel types, and the gas shortfall ERCOT named was gas for power plants. Neither report is a verdict on any one kind of generation, and neither says anything about the gas line at your house. What they show is how much of the state's supply was lost at once, and for how long.

Why did some homes stay dark for days?

Rotating outages only rotate when there are enough circuits to take turns. ERCOT reported that local utilities were limited in their ability to rotate outages because of how much generation was unavailable and how many circuits carried critical load. Customers on circuits that could not be put back into service faced extended outages and longer exposure to the cold.

Critical loads are things like hospitals and police stations, which ERCOT notes are generally exempted from rotation or given priority. When a large share of circuits is protected and the shortfall is large, the remaining circuits carry the outage for longer. A home on one of those circuits had no say in where it fell.

How cold did San Antonio get?

ERCOT compared the 2021 storm with the 2011 cold event. San Antonio's low was 19 degrees in 2011 and 12 degrees in 2021, and the PUC gives the same 12 degrees. ERCOT's comparison also shows the length of the load shed orders: 7.5 hours in 2011 against 70.5 hours in 2021.

Seventy hours at those temperatures is long enough for a house without heat to fall well below comfort, for pipes to be at risk, and for anything that runs on electricity to stop. That length, more than the low itself, is what changed how people here think about backup power.

Does a critical care registration keep the power on?

No. The PUC's load shed study is plain about it: critical status designations do not guarantee customers an uninterrupted supply of energy during a load shed event. Registering with your utility or retail provider still matters, because it puts you on the list, but it is not a backup plan for a home with medical needs.

After the storm, the PUC required utilities and retail providers to tell customers periodically about load shed, about who can be considered for critical care or critical load status, and about reducing use when load shed is likely. If someone in your home depends on powered equipment, read your provider's notice and register. Generac's own owner's manual says its home standby generators are not intended for critical life support applications, so medical equipment needs its own plan with the equipment supplier, whatever else the house has.

What changed after the storm?

The PUC adopted a weatherization rule, 16 TAC 25.55, in October 2021, carrying out Senate Bill 3, and it requires power generators to fix the known, acute issues that winter weather caused. In December 2021 it amended 16 TAC 25.479 so utilities and retail providers give customers regular load shed and critical care information.

Those rules address the supply side. They do not promise a home that the power will stay on, and the PUC's own record of the storm shows outages that outlasted the grid emergency because of damage to local lines. A house that needs power through the next long outage needs its own source.

What does a standby generator do in an outage like that?

Generac describes its Guardian home standby generators as starting within seconds of sensing a power loss, automatically, and running for as long as necessary until utility power returns, on the natural gas or propane the house already uses. The automatic transfer switch moves the house to generator power and back.

Fuel decides how long it can run. Generac calls natural gas the preferred fuel where it is available, able to supply a generator indefinitely, and notes that a propane tank needs periodic refills. On propane, the size of the tank and the supplier's delivery schedule decide how long the unit runs before it needs more.

The size comes from what you want running at once, and a cold snap changes that list: electric heat, heat pumps and well pumps all draw more when it is freezing. Our Generac generators page compares the sizes we install, and the Generac generator cost guide explains what moves the installed price.

Would a home battery have carried a house through it?

A battery stores a set amount of energy, so a multi day outage in the cold is the hardest case for one. Generac's own battery page says a battery can keep the whole home powered for a short outage or switch to the essentials for a long one, and its battery specification sheet notes the battery may derate below 32 degrees. The two are compared in our standby generator vs home battery guide.

What should you do before the next freeze?

  • Make a list of what you would need running in a long winter outage, starting with heat
  • Register with your provider if anyone in the home depends on powered medical equipment
  • Find out whether the house is on natural gas or propane, and how large the propane tank is
  • Keep a battery operated carbon monoxide alarm indoors, as Generac's manual says to

We sell and install Generac home standby and commercial generators. A free Generac sizing visit turns your list into a size and a written price, with no obligation, and the installation itself is described on our Generac generator installation page. What your city and utility require for the install is covered in home standby generator permits in Texas.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

When were the rotating outages during Winter Storm Uri?

The PUC reports that ERCOT ordered firm load shed by 1:20 a.m. on February 15, 2021, and the last controlled outage orders were canceled at 12:42 a.m. on February 18. Some homes stayed out longer because of damage to local lines.

How much load did ERCOT shed during the storm?

ERCOT reported a peak of 20,000 MW of load shed on February 15, 2021, with about 48.6 percent of generation forced out at the highest point.

Does registering for critical care guarantee power in an outage?

No. The PUC says critical status designations do not guarantee an uninterrupted supply during a load shed event. Register anyway, and plan backup for any medical equipment with its supplier.

Can a standby generator run through a multi day outage?

Generac says its home standby units run for as long as necessary until utility power returns. On natural gas that depends on the gas supply; on propane it depends on the tank and refills.

Related help

Where to go from here

Ready to get it handled?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote