
Bexar County
Electrician in Shavano Park, TX
Licensed electrical service for Shavano Park, quoted flat before we start.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Same day
Appointments available
Flat rate
Approved before work begins
TECL 41806
Licensed and insured
8am to 8pm
Open every day
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Shavano Park sits along NW Military Highway with Lockhill-Selma and De Zavala framing it and Loop 1604 across the top. Larger custom homes, generous wooded lots, and a lot of house to keep powered.
Big homes carry big loads: pools, outbuildings, and kitchens that draw like small restaurants. We size for that reality rather than hoping. The same is true of the custom stock down in Hollywood Park and out west in Fair Oaks Ranch.
On the ground
What Shavano Park actually needs
Pool and spa circuits, bonded correctly
Pool wiring is one of the few places where getting it wrong is immediately dangerous. Bonding, GFCI protection, and equipment clearances are not suggestions. We do it to code and we do not cut it.
Panel capacity for a large home
A house this size with a pool, a shop, and a couple of EVs has outgrown whatever it was built with. We do a real load calculation instead of guessing at a number.
Surge protection for a house full of systems
Automation, irrigation controls, and AV gear all die the same way. A whole-home surge device at the panel plus point-of-use protection on the sensitive equipment is the honest answer.
Electrical services in Shavano Park
The full range of Wattsmith work, available across Shavano Park. Click any service for the details.
- Electrical Repair
- Panel Upgrades
- EV Charger Installation
- Whole Home Rewiring
- Lighting Installation
- Generator Installation
- Surge Protection
- Outlets and GFCI
- Smoke and CO Detectors
- Electrical Inspections
- New Construction Wiring
Local and ready
Ready to get it handled in Shavano Park? Call us for a straight, flat-rate quote.
Offers
Flat price offers in Shavano Park
Prices from our price book. Your tech confirms the final price on site, and you approve it before any work starts.
- OfferElectrical Troubleshooting$149 covers the first hourSee the offer
- OfferReal Estate Electrical Inspection$563 flat, written report includedSee the offer
- Offer200 Amp Panel UpgradeStarting at $6,039See the offer
- OfferLevel 2 EV Charger InstallationStarting at $1,209See the offer
- OfferGenerator Interlock and InletStarting at $1,789See the offer
- OfferWhole-Home Surge ProtectionStarting at $629See the offer
The Wattsmith Standard
How we do the work
Four things we do on every job, and what happens when we miss one.
The Wattsmith On-Time Promise
We show up in the window we give you. If something moves it, you hear it from us first, with a reason. Miss the window with no heads-up, and your diagnostic fee is on us.
Flat rate before work starts
You get the price up front and you approve it before we touch a wire. No hourly meter running while you watch.
Clean job site
We protect your floors, haul our mess, and leave the space the way we found it. You should not be able to tell we were there, except the work is done right.
Code-right, or we make it right
Everything we install meets code and we stand behind it. If it is not right, we come back and fix it. That is the whole deal.
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Shavano Park electrical questions
Straight answers. If you do not see yours, call us and ask.
Do you wire pools and spas in Shavano Park?
Yes. Pool and spa circuits are bonded, GFCI protected and kept to the equipment clearances the code sets. Pool wiring is one of the few places where getting it wrong is immediately dangerous, so we do it to code and we do not cut it.
Is the panel in a large Shavano Park home big enough?
Often not any more. A larger custom home with a pool, a shop and a couple of EVs has usually outgrown the service it was built with. We do a real load calculation before recommending a panel or service upgrade, instead of guessing at a number.
What surge protection does a house full of systems need?
A whole-home surge device at the panel, plus point-of-use protection on the sensitive equipment: home automation, irrigation controls and AV gear all fail the same way when a surge comes through.
Which part of Shavano Park do you cover?
All of it: along NW Military Highway, between Lockhill-Selma Road and De Zavala Road, up to Loop 1604, and the custom homes next door in Hollywood Park and out west in Fair Oaks Ranch.
Every electrical service our San Antonio electricians offer
Need an electrician in Shavano Park?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked
Nearby areas