
Kendall County
Electrician in Boerne, TX
Licensed electrical service for Boerne, quoted flat before we start.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Same day
Appointments available
Flat rate
Approved before work begins
TECL 41806
Licensed and insured
8am to 8pm
Open every day
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Boerne sits on IH-10 where SH 46 crosses, with Cibolo Creek running past its historic Main Street and Boerne Lake off to the northwest. It is ranch country with a genuine old downtown attached, and the two halves need very different electricians.
Downtown means careful work in old buildings. Out on the acreage it means long runs, well pumps, gates, barns, and shops. We do both, and we put the specifics in our Boerne and Fair Oaks Ranch guide. The same split shows up in Fair Oaks Ranch just down IH-10 and out toward Helotes.
The ground we cover
Boerne, corridor by corridor
- IH-10
- SH 46
- Main Street
- Cibolo Creek
- Boerne Lake
- Ranch properties are systems, not job sites
- The house, the barn, the shop, the gate, and the well are one electrical system spread over acres. Planning it as a whole is how you avoid paying to trench the same ground three times.
- Historic downtown structures
- Old commercial and residential buildings on and around Main Street have wiring histories nobody documented. We survey before we quote, and we work in a way that respects the structure.
- The City of Boerne is the utility in town
- In most of Boerne the electric utility is the City of Boerne itself, which supplies natural gas as well, and its territory reaches some addresses outside the city limits. Out on the acreage the provider can be a cooperative instead. We confirm who serves your address before we give you a date for anything that touches the service.
- Permits through the city's code office
- Inside the city, electrical work is permitted through Boerne's Permitting and Code Compliance department, the contractor has to be registered with the city before applying, and city staff inspect the work. Those steps are part of our flat quote, not something you chase.
Electrical services in Boerne
The full range of Wattsmith work, available across Boerne. Click any service for the details.
- Electrical Repair
- Panel Upgrades
- EV Charger Installation
- Whole Home Rewiring
- Lighting Installation
- Generator Installation
- Surge Protection
- Outlets and GFCI
- Smoke and CO Detectors
- Electrical Inspections
- New Construction Wiring
Standby power: Generac generator installation Boerne, with every installed price in the Generac generator cost guide.
Local and ready
Ready to get it handled in Boerne? Call us for a straight, flat-rate quote.
Offers
Flat price offers in Boerne
Prices from our price book. Your tech confirms the final price on site, and you approve it before any work starts.
- OfferElectrical Troubleshooting$149 covers the first hourSee the offer
- OfferReal Estate Electrical Inspection$563 flat, written report includedSee the offer
- Offer200 Amp Panel UpgradeStarting at $6,039See the offer
- OfferLevel 2 EV Charger InstallationStarting at $1,209See the offer
- OfferGenerator Interlock and InletStarting at $1,789See the offer
- OfferWhole-Home Surge ProtectionStarting at $629See the offer
The Wattsmith Standard
How we do the work
Four things we do on every job, and what happens when we miss one.
The Wattsmith On-Time Promise
We show up in the window we give you. If something moves it, you hear it from us first, with a reason. Miss the window with no heads-up, and your diagnostic fee is on us.
Flat rate before work starts
You get the price up front and you approve it before we touch a wire. No hourly meter running while you watch.
Clean job site
We protect your floors, haul our mess, and leave the space the way we found it. You should not be able to tell we were there, except the work is done right.
Code-right, or we make it right
Everything we install meets code and we stand behind it. If it is not right, we come back and fix it. That is the whole deal.
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
Which guides go deeper on this?
FAQ
Boerne electrical questions
Straight answers. If you do not see yours, call us and ask.
Do you offer emergency electrical service in Boerne?
We keep room for urgent calls in Boerne. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.
Do you charge extra to come out to Boerne?
No trip-charge games. Boerne is inside our service area, so you get straight flat-rate pricing on the work itself, quoted before we start.
Every electrical service our San Antonio electricians offer
Local electrical guides
Electrical guides for Boerne homeowners
Need an electrician in Boerne?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked
Nearby areas