Skip to content
Wattsmith Electric

Home and business standby generators, Spring Branch

Generac generator installation Spring Branch sized to your loads and tested before we leave

Home and business standby generators in Spring Branch, sized to what you need running in an outage, installed with an automatic transfer switch and tested under load. Pedernales Electric Cooperative serves Spring Branch members: in February 2023 PEC reported that its members in the Spring Branch and Bulverde communities were in a prolonged outage. Your electric bill shows the utility for your address, and that is the one we coordinate with.

As a Generac Aligned Contractor, we sell and install Generac home standby and commercial generators.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Working in Spring Branch

What does a generator need in Spring Branch?

A load list that includes the well pump, where the house runs on one, and a licensed Texas electrical contractor, which TDLR requires for home backup systems. Spring Branch has no city permit office, and Comal County's permits page names no home electrical permit, so we check the county's floodplain determination before setting the unit.

A Generac install in Spring Branch

We list what you want running in an outage, check the panel and the service, and recommend the Generac unit and the transfer switch to match. Then we set the unit, mount and wire the automatic transfer switch, run the wiring between the generator, the switch and your panel, and start it up and test it under load before we leave. For a business, the same sizing and transfer switch work applies at commercial scale.

  • A load list room by room
  • Automatic transfer switch at the service
  • Start up and a transfer test under load

When the house runs on a well

Where a Spring Branch home runs on its own well, the pump stops when the power does, and so does the water. We put the well pump on the generator's load list with the house and size the unit for the pump's starting load, so water comes back with the lights.

The utility side in Spring Branch

Pedernales Electric Cooperative serves Spring Branch members: in February 2023 PEC reported that its members in the Spring Branch and Bulverde communities were in a prolonged outage. Your electric bill shows the utility for your address, and that is the one we coordinate with. PEC asks for a call before a generator is connected to a home's circuits if a service modification or a meter disconnect is needed, and it says connecting a generator without a UL approved open transition or automatic transfer switch violates the electrical code.

Permits in Spring Branch

Spring Branch has no city government, and Comal County's permits page names no electrical permit for a house in the unincorporated county. It does list a floodplain permit, a fire marshal permit for commercial and public buildings, and a dark skies permit for outdoor lighting inside the Camp Bullis Dark Skies Zone. We check the county's floodplain determination for your lot before the unit's spot is set.

Contractor registration

There is no city registration in Spring Branch. We work under our Texas electrical contractor license, and TDLR says home backup systems must be installed by licensed Texas electrical contractors with licensed electricians.

Questions about generac generator installation in spring branch? Call or get a quote.

Generator quote

How do I book a free Generac sizing visit in Spring Branch?

Tell us what you want to keep running in an outage. We call back to set up the sizing visit.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do people ask about Generac generators in Spring Branch?

Straight answers. If you do not see yours, call us and ask.

Which electric utility serves a generator install in Spring Branch?

Pedernales Electric Cooperative serves Spring Branch members: in February 2023 PEC reported that its members in the Spring Branch and Bulverde communities were in a prolonged outage. Your electric bill shows the utility for your address, and that is the one we coordinate with.

Who handles generator permits in Spring Branch?

Spring Branch has no city government, and Comal County's permits page names no electrical permit for a house in the unincorporated county. It does list a floodplain permit, a fire marshal permit for commercial and public buildings, and a dark skies permit for outdoor lighting inside the Camp Bullis Dark Skies Zone. We check the county's floodplain determination for your lot before the unit's spot is set.

Does Spring Branch require contractor registration?

There is no city registration in Spring Branch. We work under our Texas electrical contractor license, and TDLR says home backup systems must be installed by licensed Texas electrical contractors with licensed electricians.

Who runs the gas line for a generator in Spring Branch?

The gas line is included in your price. A licensed plumber runs it, and we schedule the plumber for you. We schedule the plumber around the electrical work.

Call NowGet a Quote