Skip to content
Wattsmith Electric

Generator Installation

Generator repair in San Antonio

Generator repair by a licensed electrician, TECL 41806: the connections, transfer switches and inlet boxes between your generator and your home, tested and repaired so backup power works when the grid goes down.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

A generator that runs is only half of backup power. The other half is the path from the generator into the house: the inlet box, the cord, the interlock or transfer switch, and the circuits it feeds. When the grid goes down and the lights stay off, that path is often where the fault is.

We test that path from end to end, find what is not carrying power, and repair it to code. If the problem is inside the generator's engine, we say so plainly, so you can call the dealer or service shop that works on it.

What generator repair covers

  • Automatic transfer switches that do not switch
  • Manual transfer switches and interlock kits
  • Generator inlet boxes and cords
  • Connections at the panel and at the generator
  • Circuits that stay dark on generator power
  • A test run under load once repaired

How generator repair goes

  1. 1.You tell us what happens when the generator runs and what does not get power.
  2. 2.The electrician tests the connection, the switch and the circuits to find where power stops.
  3. 3.You get one flat price for the generator repair and approve it before work starts.
  4. 4.The fault is repaired and the system is run on generator power, so you know it works before the next outage.

A veteran-owned electrician serving San Antonio, including Alamo Heights, Stone Oak and Helotes.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

Usually something between the generator and the panel: a transfer switch that is not switching, an interlock left in the wrong position, a failed inlet box or a loose connection. We test each point to find it.

Ready for an electrician who does it right?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote