
Guadalupe County
Electrician in Marion, TX
Licensed electrical service for Marion, quoted flat before we start.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Same day
Appointments available
Flat rate
Approved before work begins
TECL 41806
Licensed and insured
8am to 8pm
Open every day
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Marion is a small Guadalupe County town on FM 78 with IH-10 running south of it, sitting in the country between Seguin and the Cibolo line. It is small enough that people notice a strange truck and friendly enough to wave at it anyway.
Properties out here often sit on acreage, so well pumps, shop wiring, and generator hookups come up alongside the ordinary panel work. We make the drive and quote it flat. The same rural pattern runs east to Seguin and tightens up west into Cibolo.
The ground we cover
Marion, corridor by corridor
- FM 78
- IH-10
- Small town, long runs
- In-town lots and acreage properties are different jobs. On the acreage the distance is the cost driver, and we size for it rather than pretending the run is shorter than it is.
- Wells and the outage problem
- If the pump is electric, an outage is a water outage. Generator and transfer switch work is ordinary out here for exactly that reason.
- The co-op, not the city utility
- Out here the provider is usually a cooperative rather than a city utility, and that changes how a new service gets applied for and how long it takes. We confirm who serves your address before we promise you anything.
Electrical services in Marion
The full range of Wattsmith work, available across Marion. Click any service for the details.
- Electrical Repair
- Panel Upgrades
- EV Charger Installation
- Whole Home Rewiring
- Lighting Installation
- Generator Installation
- Surge Protection
- Outlets and GFCI
- Smoke and CO Detectors
- Electrical Inspections
- New Construction Wiring
Local and ready
Call Wattsmith Electric and get a flat-rate quote for your Marion project today.
Offers
Flat price offers in Marion
Prices from our price book. Your tech confirms the final price on site, and you approve it before any work starts.
- OfferElectrical Troubleshooting$149 covers the first hourSee the offer
- OfferReal Estate Electrical Inspection$563 flat, written report includedSee the offer
- Offer200 Amp Panel UpgradeStarting at $6,039See the offer
- OfferLevel 2 EV Charger InstallationStarting at $1,209See the offer
- OfferGenerator Interlock and InletStarting at $1,789See the offer
- OfferWhole-Home Surge ProtectionStarting at $629See the offer
The Wattsmith Standard
How we do the work
Four things we do on every job, and what happens when we miss one.
The Wattsmith On-Time Promise
We show up in the window we give you. If something moves it, you hear it from us first, with a reason. Miss the window with no heads-up, and your diagnostic fee is on us.
Flat rate before work starts
You get the price up front and you approve it before we touch a wire. No hourly meter running while you watch.
Clean job site
We protect your floors, haul our mess, and leave the space the way we found it. You should not be able to tell we were there, except the work is done right.
Code-right, or we make it right
Everything we install meets code and we stand behind it. If it is not right, we come back and fix it. That is the whole deal.
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Marion electrical questions
Straight answers. If you do not see yours, call us and ask.
Can you handle both my home and my rental in Marion?
Absolutely. We work with homeowners and landlords across Marion, from a single repair to a full panel upgrade or a turn between tenants.
How fast can you get to Marion?
For most calls in Marion we can offer same-day or next-day service during business hours. Call and we will give you the soonest honest window.
Every electrical service our San Antonio electricians offer
Need an electrician in Marion?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked
Nearby areas