Skip to content
Wattsmith Electric

Generac Guardian 14kW home standby

Generac 14kW generator installed in San Antonio

Generac rates the Generac Guardian 14kW at 14,000 watts on propane and 14,000 watts on natural gas. Whether that carries your house depends on your load list, which a free sizing visit settles.

We sell and install Generac home standby and commercial generators.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

The 14kW in plain terms

What will a Generac 14kW generator run?

A Generac 14kW runs whatever fits inside its rating at the same time, including the starting current of a central air conditioner. Generac rates it at 14,000 watts on both propane and natural gas, so your fuel does not change what it carries. Your load list decides whether that is the whole house or essential circuits.

What it puts out

Generac rates it at 14,000 watts on both propane and natural gas, so the fuel you choose does not change what it can carry.

What it can run

A 14kW unit carries the loads that fit inside its rating at the same time, including the extra current a central air conditioner draws as it starts. Only your load list can say whether that is the whole house or a set of essential circuits.

  • Your air conditioning and how it starts
  • The refrigerator, freezer and well or sump pump
  • Medical equipment and the home office

Compared with the sizes beside it

The 18kW above it is rated 17,000 watts on natural gas, 3,000 watts more.

Transfer switch

The unit needs a transfer switch matched to your service and to the loads you choose: whole house, essential circuits, or load management for large air conditioning loads.

Installation

We set the unit, install and wire the transfer switch, pull the electrical permit and start it up under load. Gas line and gas connection are not included. That is a licensed plumber's work and we quote it separately.

Cost

The installed price for a 14kW is the unit plus the switch, the electrical work, the gas line, placement and the permit. We write yours after the free sizing visit.

Questions about generac 14kw generator installation? Call or get a quote.

From Generac's published specifications

What are the Generac 14kW generator's specifications?

Generac's published figures list the Guardian 14kW, base model G007223, at 14,000 watts on propane and on natural gas. It has a G-Force 800 engine, a 60 amp main line circuit breaker and weighs 385 lb. Generac publishes a 5 Year Limited Warranty and notes that specifications are subject to change without notice.

Generac base modelG007223
Rated power, propane14,000 watts
Rated power, natural gas14,000 watts
EngineG-Force 800
Main line circuit breaker60 amps
Weight385 lb
Warranty, as Generac publishes it5 Year Limited Warranty

Figures as Generac published them on 2026-10-31. Generac notes that specifications are subject to change without notice, and the written warranty terms for the exact model are Generac's. Source: Generac's 14kW product page and its spec sheet.

Questions about generac 14kw generator installation? Call or get a quote.

Generac quote

Is the Generac 14kW right for my house?

Leave your name and number. We set the free sizing visit and tell you plainly which size fits.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do people ask about the Generac 14kW generator?

Straight answers. If you do not see yours, call us and ask.

Generac rates it at 14,000 watts on propane and 14,000 watts on natural gas.

Call NowGet a Quote