
Service
Whole House Rewiring in San Antonio
Old wiring pulled out, new wiring run to code, your home made safe.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Same day
Appointments available
Flat rate
Approved before work begins
TECL 41806
Licensed and insured
8am to 8pm
Open every day
Electrical emergency? Sparks, burning smell, or a dead panel: call (210) 446-5446 now
Emergency service$49 Off
Your First Service Call
New customers take $49 off their first diagnostic or service call with Wattsmith Electric.
New residential customers only. One per household. Valid on your first service call only. Not combinable with other offers. No cash value. Mention this offer when you book.
Our service guarantees
- We hit your window. Miss it with no heads-up, and that is $149 off.
- You approve one flat price before we touch a wire. No hourly meter.
- We protect your floors, haul our mess, and leave the space clean.
- Everything meets code and we stand behind it, or we come back and fix it.
Wattsmith Electric works to the 2023 National Electrical Code and pulls the permit where one is required. How we handle permits, inspections and the workmanship guarantee is on our standards page. The license, the coverage in force and our federal registrations, including the certificate of insurance process for contractors, are on insurance and licensing.
Why it does not pay to wait
Old cloth, knob-and-tube, and aluminum branch wiring gets brittle and loose with age and heat. It works right up until a connection arcs inside a wall. It is also why insurers drop or refuse to write policies. Waiting risks both the house and the coverage on it.
San Antonio has beautiful older homes, and a lot of them are still running on wiring that was old news thirty years ago. Knob and tube, cloth-covered conductors, ungrounded circuits, aluminum branch wiring. That is not a maybe-someday job. That is the reason a lot of these homes cannot get insured.
We rewire with a plan. We map the circuits, protect the finishes we can, run new grounded copper, and bring the panel and devices up to current code. When we are done, your home is safe, insurable, and ready for real modern loads.
What house rewiring in San Antonio covers
- Full and partial rewires for older homes
- Knob and tube and cloth wiring removal
- Aluminum branch circuit replacement or remediation
- Grounding and bonding brought to current code
- New receptacles, switches, and GFCI or AFCI protection
- Panel replacement coordinated with the rewire
Signs you need this
- You have two-prong ungrounded outlets throughout the house
- Your insurer flagged knob and tube or aluminum wiring
- Fabric or brittle insulation is visible in the attic or panel
- Circuits are overloaded and there is no room to add more
What you can check yourself first
Before you call, here is what you can safely check on your own. Even if you still call us, you will walk in knowing more than you did.
- Count your two-prong, ungrounded outlets. A lot of them points to older wiring.
- Look in the attic or the panel for cloth-covered or brittle wiring.
- Check whether your home still runs on a fuse box instead of breakers.
- Ask your insurer if your wiring is flagged. Knob-and-tube and aluminum branch wiring often are.
Straight pricing
Free estimate. We walk the job first, since scope, access, and finishes all matter, then give you one fixed number before anything starts.
- Up to three options on a job, each a real way to do it, priced flat. You choose the scope.
- The estimate is free. Nothing is owed until you approve the work.
- The price you approve is the price you pay.
Book a wiring inspection
Flat-rate quote before any work starts. A Wattsmith electrician calls you back within 15 minutes during business hours.
Where we work
Whole Home Rewiring across the San Antonio metro
We bring whole home rewiring to San Antonio and the surrounding communities. Find your area below or call and we will confirm we cover you.
- Whole Home Rewiring, Alamo Heights
- Whole Home Rewiring, Stone Oak
- Whole Home Rewiring, Helotes
- Whole Home Rewiring, Schertz
- Whole Home Rewiring, Converse
- Whole Home Rewiring, Universal City
- Whole Home Rewiring, Leon Valley
- Whole Home Rewiring, Boerne
- Whole Home Rewiring, New Braunfels
- Whole Home Rewiring, Cibolo
We do whole home rewiring across the rest of the metro too, including Live Oak, Selma, Timberwood Park, Hollywood Park, Castle Hills, Windcrest, Kirby, Alamo Ranch, Westover Hills, Medical Center, Bulverde, Fair Oaks Ranch, Terrell Hills, Olmos Park, Shavano Park, Garden Ridge, Spring Branch, Canyon Lake, Seguin, Marion, Saint Hedwig, Adkins, La Vernia, Elmendorf, China Grove, Von Ormy, Somerset, Lytle, Castroville and Floresville.
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Whole Home Rewiring questions
Straight answers. If you do not see yours, call us and ask.
Do you have to tear open all my walls?
No. We fish new wire through existing cavities wherever we can and open drywall only where access demands it. We tell you up front where patching will be needed so there are no surprises.
Can I live in the house during a rewire?
Usually yes. We work in sections and keep power on where we can. We plan the outage windows with you so daily life keeps moving.
Will this help with insurance?
Often, yes. Many insurers will not write or renew a policy on knob and tube or aluminum wiring. A documented, permitted rewire clears that flag and we provide the paperwork.
Keep exploring
Related work and guides
Related services
Helpful guides
Need whole home rewiring done right?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked