A Generac install in Garden Ridge
We list what you want running in an outage, check the panel and the service, and recommend the Generac unit and the transfer switch to match. Then we set the unit, mount and wire the automatic transfer switch, run the wiring between the generator, the switch and your panel, and start it up and test it under load before we leave. For a business, the same sizing and transfer switch work applies at commercial scale.
- A load list room by room
- Automatic transfer switch at the service
- Start up and a transfer test under load