
Comal County
Electrician in New Braunfels, TX
Licensed electrical service for New Braunfels, quoted flat before we start.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Same day
Appointments available
Flat rate
Approved before work begins
TECL 41806
Licensed and insured
8am to 8pm
Open every day
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
New Braunfels sits on IH-35 between the Comal and the Guadalupe, with Loop 337 wrapping the town, Landa Park on the Comal springs, and the historic Gruene district up on the Guadalupe. It is booming, and it is old, at the same time.
That produces the widest spread of work we see anywhere: rough-in on new construction one day, a delicate panel swap in a century-old downtown home the next. The growth continues down the interstate in Cibolo and Schertz, and the river conditions carry upstream to Canyon Lake.
The ground we cover
New Braunfels, corridor by corridor
- IH-35
- SH 46
- Loop 337
- the Comal River
- the Guadalupe River
- Gruene
- Landa Park
- Two rivers means real GFCI discipline
- The Comal and the Guadalupe are the reason the town exists and the reason exterior protection matters. Anything near water, in a garage, or below grade gets the protection code calls for.
- Historic downtown rewires
- Homes near the old center are the better part of a century old. A rewire there is a careful job through plaster, not a production run. We plan the routes before we cut.
- New Braunfels Utilities, not CPS Energy
- Most of New Braunfels gets its power from New Braunfels Utilities, the city-owned utility, rather than CPS Energy, and that changes the service application and the timeline for a new or upgraded service. We confirm the provider for your address and sort the application out up front, so the date we give you is a date that holds.
- A city permit for any electrical work
- Inside the city limits, New Braunfels requires a permit for installing, altering, repairing or replacing any electrical system, pulled by an electrical contractor registered with the city. The city builds to the 2020 National Electrical Code, one edition behind the 2023 code San Antonio enforces, and we wire to the edition your address is inspected under.
Electrical services in New Braunfels
The full range of Wattsmith work, available across New Braunfels. Click any service for the details.
- Electrical Repair
- Panel Upgrades
- EV Charger Installation
- Whole Home Rewiring
- Lighting Installation
- Generator Installation
- Surge Protection
- Outlets and GFCI
- Smoke and CO Detectors
- Electrical Inspections
- New Construction Wiring
Standby power: Generac generator installation New Braunfels, with every installed price in the Generac generator cost guide.
Local and ready
Whatever your New Braunfels home or business needs, we quote it flat and do it right. Call today.
Offers
Flat price offers in New Braunfels
Prices from our price book. Your tech confirms the final price on site, and you approve it before any work starts.
- OfferElectrical Troubleshooting$149 covers the first hourSee the offer
- OfferReal Estate Electrical Inspection$563 flat, written report includedSee the offer
- Offer200 Amp Panel UpgradeStarting at $6,039See the offer
- OfferLevel 2 EV Charger InstallationStarting at $1,209See the offer
- OfferGenerator Interlock and InletStarting at $1,789See the offer
- OfferWhole-Home Surge ProtectionStarting at $629See the offer
The Wattsmith Standard
How we do the work
Four things we do on every job, and what happens when we miss one.
The Wattsmith On-Time Promise
We show up in the window we give you. If something moves it, you hear it from us first, with a reason. Miss the window with no heads-up, and your diagnostic fee is on us.
Flat rate before work starts
You get the price up front and you approve it before we touch a wire. No hourly meter running while you watch.
Clean job site
We protect your floors, haul our mess, and leave the space the way we found it. You should not be able to tell we were there, except the work is done right.
Code-right, or we make it right
Everything we install meets code and we stand behind it. If it is not right, we come back and fix it. That is the whole deal.
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
New Braunfels electrical questions
Straight answers. If you do not see yours, call us and ask.
Are you licensed to work in New Braunfels?
Yes. We are a licensed and insured Texas electrical contractor and we pull the proper permits for work in New Braunfels wherever code requires it.
Do you actually service New Braunfels?
Yes. New Braunfels is part of our regular San Antonio metro service area. You get the same flat-rate pricing and the same crew that serves the rest of the region.
Every electrical service our San Antonio electricians offer
Need an electrician in New Braunfels?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked
Nearby areas