Skip to content
Wattsmith Electric

Generac Guardian 22kW home standby

Generac 22kW generator installed in San Antonio

Generac rates the Generac Guardian 22kW at 22,000 watts on propane and 19,500 watts on natural gas. Whether that carries your house depends on your load list, which a free sizing visit settles.

We sell and install Generac home standby and commercial generators.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

The 22kW in plain terms

What will a Generac 22kW generator run?

A Generac 22kW runs the loads that fit inside 22,000 watts on propane or 19,500 watts on natural gas at once, including how your air conditioning starts. Generac sells this model with a 200 amp, NEMA 3R smart switch for up to whole house protection. Your load list, taken at a free sizing visit, says whether that covers your house.

What it puts out

Generac rates it at 22,000 watts on propane and 19,500 watts on natural gas: 2,500 watts less on natural gas. If your home is on natural gas, size from the natural gas figure.

What it can run

A 22kW unit carries the loads that fit inside its rating at the same time, including the extra current a central air conditioner draws as it starts. Only your load list can say whether that is the whole house or a set of essential circuits.

  • Your air conditioning and how it starts
  • The refrigerator, freezer and well or sump pump
  • Medical equipment and the home office

Compared with the sizes beside it

The 18kW below it is rated 17,000 watts on natural gas, 2,500 watts less. The 24kW above it is rated 21,000 watts on natural gas, 1,500 watts more.

Transfer switch

Sold with a 200 amp, NEMA 3R smart switch for up to whole house protection (model G007043). Whether that switch suits your service, or an essential circuit switch fits better, is part of the sizing visit.

Installation

We set the unit, install and wire the transfer switch, pull the electrical permit and start it up under load. Gas line and gas connection are not included. That is a licensed plumber's work and we quote it separately.

Cost

The installed price for a 22kW is the unit plus the switch, the electrical work, the gas line, placement and the permit. We write yours after the free sizing visit.

Questions about generac 22kw generator installation? Call or get a quote.

From Generac's published specifications

What are the Generac 22kW generator's specifications?

Generac's published figures list the Guardian 22kW, base model G007043, at 22,000 watts on propane and 19,500 watts on natural gas, 2,500 watts less on natural gas. It moves up to the G-Force 1000 engine and weighs 466 lb. Generac publishes a 5 Year Limited Warranty and says specifications are subject to change without notice.

Generac base modelG007043
Rated power, propane22,000 watts
Rated power, natural gas19,500 watts
EngineG-Force 1000
Weight466 lb
Warranty, as Generac publishes it5 Year Limited Warranty

Figures as Generac published them on 2026-10-31. Generac notes that specifications are subject to change without notice, and the written warranty terms for the exact model are Generac's. Source: Generac's 22kW product page and its spec sheet.

Questions about generac 22kw generator installation? Call or get a quote.

Generac quote

Is the Generac 22kW right for my house?

Leave your name and number. We set the free sizing visit and tell you plainly which size fits.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do people ask about the Generac 22kW generator?

Straight answers. If you do not see yours, call us and ask.

Generac rates it at 22,000 watts on propane and 19,500 watts on natural gas.

Call NowGet a Quote