Skip to content
Wattsmith Electric
A downtown San Antonio glass high-rise at dusk on Houston Street

Our Story

Veteran-Owned Electrician, Built on the Standard

One electrician, one price quoted up front, and work done the way it should be done the first time.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Why we started

We started Wattsmith because we were tired of watching people get worked over on electrical jobs. The pattern is always the same. An hourly meter you cannot see. A quote that changes once the wall is open. A crew that vanishes the day after the check clears. Electrical is not the place to gamble, because the failures do not stay small. A loose connection becomes a hot panel, and a hot panel becomes a fire. We built a company that treats the work with the seriousness it actually carries.

What the service taught us

The company is veteran-owned and the standard comes out of the military: do the job to standard rather than to whatever passes, and leave the space better than you found it.

That is a checklist, not a value statement. It is what we run on every call, because work done to standard is the only kind that holds up when nobody is watching it.

Why we quote flat

Flat-rate pricing is the honest version of this trade. We look at the panel, the meter, and the service first, then hand you one number for the whole job. You approve it before we lift a tool. If we open something up and find a problem, we stop and price it before we touch it, so the bill at the end is the number you agreed to at the start. No meter running while you watch, no line items you did not sign off on. The price is the price.

Who holds the license

Our master of record is Adam G. Palacios, Texas Master Electrician ME 284452. Every job we do is performed under his license and the company’s TECL 41806, and both are checkable in the TDLR registry without taking our word for it.

That is not a formality. A master of record who is not actually in the work is how a license gets rented out, and it is why some outfits cannot tell you who theirs is. Ours sets the installation standard, reviews the work, and trains the crew to it. The standards page is what that comes to in practice.

The plain facts in one place, our license, hours, service area, pricing and warranty, are on the facts and answers page.

The promise we stand on

We give you a real arrival window and we hit it. If we are ever going to run late, you hear it from us first, with a reason, and if we miss the window with no heads-up, the diagnostic is on us. We launched in San Antonio and we work across this metro. The plan runs bigger than that, across Texas, but the window and what happens when we miss it do not change with the map.

The On-Time Promise: we give you a scheduled arrival window and we hit it. If we are running late, you hear from us before the window closes, with a reason. If we miss your window without that call, $149 comes off that visit: the diagnostic fee where one applies, and $149 off the work where the visit was a free estimate. Applies to scheduled residential visits with a confirmed window; one $149 credit per visit; does not apply where access, weather, or safety prevents the visit.

Wattsmith Electric is BBB accredited. That is a standard we applied for and hold, the same way we hold the license: reviewed, on record, and yours to check.

Wattsmith Electric LLC BBB Business Review

Wattsmith Electric is part of Craftline Brands, the parent company behind the trades businesses we operate.

TECL 41806

Texas licensed contractor

BBB

Accredited business

7 counties

Across the San Antonio metro

8am to 8pm

Open every day

Certifications & credentials

Verified, on record, and yours to check

Wattsmith Electric holds the SBA Veteran Small Business Certification, Texas HUB certification through VetHUB, and a Texas electrical contractor license. Government and general-contractor buyers can verify every mark below against the public record.

U.S. Small Business Administration Service-Disabled Veteran-Owned Small Business certification seal
SDVOSBService-Disabled Veteran-Owned Small Business
U.S. Small Business Administration Veteran-Owned Small Business certification seal
VOSBVeteran-Owned Small Business

SBA Veteran Small Business Certification (VetCert), issued September 14, 2026, active through September 13, 2029.

  • VetHUBTexas Historically Underutilized Business

    Texas Comptroller of Public Accounts. Certified September 8, 2026; renewal September 8, 2030. Registered on the CMBL.

  • TECL 41806Texas Licensed Electrical Contractor

    Texas Department of Licensing and Regulation. Licensed and insured.

  • BBB AccreditedBetter Business Bureau

    Accredited business, reviewed and on record.

UEI
H96JWM4S6UJ3
CAGE
23HG8
NAICS
238210
Electrical Contractors and Other Wiring Installation Contractors
Download our capability statement (PDF)

What we stand on

Four pillars, no exceptions

Workmanship

We do it right and to code, built to last. We do not chase the fast, cheap fix that fails in a year.

Diagnostics

We trace the circuit to the real cause instead of guessing and swapping parts on your dime.

Straight pricing

Flat rate quoted before work starts. You approve the number, then we work. No hourly meter, no surprise invoice.

Veteran discipline

On time, squared away, clean job sites. We do what we say we will do, on the day we said we would do it.

The Wattsmith Standard

How we do the work

Four things we do on every job, and what happens when we miss one.

The Wattsmith On-Time Promise

We show up in the window we give you. If something moves it, you hear it from us first, with a reason. Miss the window with no heads-up, and your diagnostic fee is on us.

Flat rate before work starts

You get the price up front and you approve it before we touch a wire. No hourly meter running while you watch.

Clean job site

We protect your floors, haul our mess, and leave the space the way we found it. You should not be able to tell we were there, except the work is done right.

Code-right, or we make it right

Everything we install meets code and we stand behind it. If it is not right, we come back and fix it. That is the whole deal.

Put a real electrician on your home

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote