Lighting Installation
Ceiling fan repair in San Antonio
Ceiling fan repair by a licensed electrician, TECL 41806: wobbling, humming or dead fans, failed switches and remotes, bad capacitors and loose mounting boxes diagnosed and fixed, at one flat price before work starts.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Most fan problems come down to a few causes. A wobble is usually balance or a loose mount. A hum or a fan stuck on one speed is often the capacitor. A fan that will not respond at all may be the switch, the remote, its receiver or the wiring. We test to find which before replacing anything.
When a repair makes sense, we make it. When the motor has failed or the parts cost more than a new fan is worth, we say so, and replacing it with a new fan on a properly rated box is priced as a separate choice.
What ceiling fan repair covers
- Wobbling or noisy fans
- Humming fans and fans stuck on one speed
- Fans that will not turn on
- Failed wall switches, speed controls and remotes
- Bad capacitors and receivers
- Loose or unrated mounting boxes
How ceiling fan repair goes
- 1.You tell us what the fan does and how long it has done it.
- 2.The electrician checks the mount, the controls, the capacitor and the wiring to find the cause.
- 3.You get one flat price to repair the fan, or to replace it when repair does not make sense, and approve it before work starts.
- 4.The fault is fixed, the fan is balanced and run on every speed with its controls.
A veteran-owned electrician serving San Antonio, including Alamo Heights, Stone Oak and Helotes.
FAQ
Common questions
Straight answers. If you do not see yours, call us and ask.
Blades out of balance, a blade bracket bent or loose, or a mount that has worked loose. A loose mount matters most, because the fan's weight hangs from it. We check the mount first and then balance the blades.
Ready for an electrician who does it right?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked