
Bexar County
Electrician in Olmos Park, TX
Licensed electrical service for Olmos Park, quoted flat before we start.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Same day
Appointments available
Flat rate
Approved before work begins
TECL 41806
Licensed and insured
8am to 8pm
Open every day
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Olmos Park is a few hundred homes between McCullough and Hildebrand, sitting just under the Olmos Basin and the dam that gives the whole area its name. The houses date to the early part of the last century, and a lot of them still carry the wiring philosophy of that century behind very good plaster.
Careful is the word for the work here. You do not open a wall in one of these homes casually. We plan the route before we cut, and the tripping-breaker pattern we see is the same one we documented for the neighbors in the Terrell Hills and Olmos Park breaker guide. Same story a short drive away in Alamo Heights, and again in the older stretches of Castle Hills.
On the ground
What Olmos Park actually needs
Old wiring behind good bones
Early-century homes can hide cloth-insulated conductors and, in the oldest of them, knob and tube. It is not a reason to panic and it is not something to leave alone either. We find out what is actually in the walls before anyone quotes a number.
Plaster is not drywall
A rewire through plaster and lath is a different job than a rewire through drywall, and anyone quoting it the same has not done it. We plan the fishing routes to keep the finishes intact, and we say up front where a patch is unavoidable.
Basin-adjacent lots and grounding
Grounding is the part nobody sees and everybody depends on. On older homes near the basin we check the grounding electrode and bonding rather than assuming the last person got it right.
Electrical services in Olmos Park
The full range of Wattsmith work, available across Olmos Park. Click any service for the details.
- Electrical Repair
- Panel Upgrades
- EV Charger Installation
- Whole Home Rewiring
- Lighting Installation
- Generator Installation
- Surge Protection
- Outlets and GFCI
- Smoke and CO Detectors
- Electrical Inspections
- New Construction Wiring
Local and ready
Call Wattsmith Electric and get a flat-rate quote for your Olmos Park project today.
Offers
Flat price offers in Olmos Park
Prices from our price book. Your tech confirms the final price on site, and you approve it before any work starts.
- OfferElectrical Troubleshooting$149 covers the first hourSee the offer
- OfferReal Estate Electrical Inspection$563 flat, written report includedSee the offer
- Offer200 Amp Panel UpgradeStarting at $6,039See the offer
- OfferLevel 2 EV Charger InstallationStarting at $1,209See the offer
- OfferGenerator Interlock and InletStarting at $1,789See the offer
- OfferWhole-Home Surge ProtectionStarting at $629See the offer
The Wattsmith Standard
How we do the work
Four things we do on every job, and what happens when we miss one.
The Wattsmith On-Time Promise
We show up in the window we give you. If something moves it, you hear it from us first, with a reason. Miss the window with no heads-up, and your diagnostic fee is on us.
Flat rate before work starts
You get the price up front and you approve it before we touch a wire. No hourly meter running while you watch.
Clean job site
We protect your floors, haul our mess, and leave the space the way we found it. You should not be able to tell we were there, except the work is done right.
Code-right, or we make it right
Everything we install meets code and we stand behind it. If it is not right, we come back and fix it. That is the whole deal.
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Olmos Park electrical questions
Straight answers. If you do not see yours, call us and ask.
Do older Olmos Park homes still have knob and tube wiring?
Some do. The houses date to the early part of the last century, and early-century homes can hide cloth-insulated conductors and, in the oldest of them, knob and tube. We find out what is actually in the walls before anyone quotes a number.
Can you rewire an Olmos Park home without wrecking the plaster?
Yes, with planning. A rewire through plaster and lath is a different job from one through drywall. We plan the fishing routes before we cut to keep the finishes intact, and we say up front where a patch cannot be avoided.
Why do the breakers keep tripping in my Olmos Park home?
Usually load, not a bad breaker: a circuit carrying more than it was run for. It is the same pattern we documented for Olmos Park and Terrell Hills in our breaker guide, and we find the load rather than fitting a bigger breaker.
Do you check the grounding on homes near the Olmos Basin?
Yes. Grounding is the part nobody sees and everybody depends on, so on older homes near the basin we check the grounding electrode and bonding rather than assuming the last person got it right.
Every electrical service our San Antonio electricians offer
Local electrical guides
Electrical guides for Olmos Park homeowners
Need an electrician in Olmos Park?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked
Nearby areas