
Bexar County
Electrician in Selma, TX
Licensed electrical service for Selma, quoted flat before we start.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Same day
Appointments available
Flat rate
Approved before work begins
TECL 41806
Licensed and insured
8am to 8pm
Open every day
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Selma grew up around The Forum at Olympia Parkway on IH-35, with Retama Park just up the road and Evans Road running west. It is one of the few places we work where the commercial and the residential arrived at roughly the same time.
So we see both: panel upgrades and EV installs for the homes, build-outs and lighting for the retail. The residential half looks a lot like Live Oak next door, and the growth pattern matches Cibolo up the corridor.
The electrical reality in Selma
Retail build-outs on a lease clock. A tenant paying rent on a space that cannot open is bleeding. We sequence the electrical so we are not the long pole, and we pull the permits properly so the inspection does not bounce.
Newer homes, modern loads. The residential stock here is new enough that the panel is fine until the charger shows up. We do the load calculation before you buy the car, not after.
Parking and site lighting. Commercial exterior lighting is a safety and liability item as much as an aesthetic one. We wire it on proper circuits with controls that work.
Electrical services in Selma
The full range of Wattsmith work, available across Selma. Click any service for the details.
- Electrical Repair
- Panel Upgrades
- EV Charger Installation
- Whole Home Rewiring
- Lighting Installation
- Generator Installation
- Surge Protection
- Outlets and GFCI
- Smoke and CO Detectors
- Electrical Inspections
- New Construction Wiring
Local and ready
Call Wattsmith Electric and get a flat-rate quote for your Selma project today.
Offers
Flat price offers in Selma
Prices from our price book. Your tech confirms the final price on site, and you approve it before any work starts.
- OfferElectrical Troubleshooting$149 covers the first hourSee the offer
- OfferReal Estate Electrical Inspection$563 flat, written report includedSee the offer
- Offer200 Amp Panel UpgradeStarting at $6,039See the offer
- OfferLevel 2 EV Charger InstallationStarting at $1,209See the offer
- OfferGenerator Interlock and InletStarting at $1,789See the offer
- OfferWhole-Home Surge ProtectionStarting at $629See the offer
The Wattsmith Standard
How we do the work
Four things we do on every job, and what happens when we miss one.
The Wattsmith On-Time Promise
We show up in the window we give you. If something moves it, you hear it from us first, with a reason. Miss the window with no heads-up, and your diagnostic fee is on us.
Flat rate before work starts
You get the price up front and you approve it before we touch a wire. No hourly meter running while you watch.
Clean job site
We protect your floors, haul our mess, and leave the space the way we found it. You should not be able to tell we were there, except the work is done right.
Code-right, or we make it right
Everything we install meets code and we stand behind it. If it is not right, we come back and fix it. That is the whole deal.
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Selma electrical questions
Straight answers. If you do not see yours, call us and ask.
Do you charge extra to come out to Selma?
No trip-charge games. Selma is inside our service area, so you get straight flat-rate pricing on the work itself, quoted before we start.
Do you offer emergency electrical service in Selma?
We keep room for urgent calls in Selma. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.
Every electrical service our San Antonio electricians offer
Need an electrician in Selma?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked
Nearby areas