Careers
Become a Wattsmith
A veteran-owned crew that runs to a documented standard in San Antonio. W-2 pay, real supervision, and a ladder from apprentice to license holder.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
W-2
A real paycheck, taxes handled
Veteran
Owned and operated
Take-home truck
Stocked, for lead roles
No quotas
The book does the selling
The Wattsmith standard
What we run, and why techs stay
Wattsmith runs on documented systems, not guesswork. Flat-rate pricing quoted and approved before the work starts. Written install standards. A licensed master signing off on the work. That is the same discipline whether you are the customer or the crew.
Techs stay because the deal is straight both directions. W-2 employment, honest pay for skill, real supervision that makes you sharper, and a ladder you can actually climb. Run good work to the standard and get paid for it. That is the whole of it.
What you get here
- W-2 employment. You are an employee with a real paycheck and taxes handled, not a 1099 handed a truck and left to sort it out.
- Flat-rate integrity. The customer approves the price before we touch a wire, so you do the work right instead of racing a clock.
- A take-home company truck for lead roles, stocked and maintained. You start the day from your driveway, not a yard across town.
- Documented systems. Dispatch, quoting, and install standards are written down, so the job runs the same right way every time.
- Veteran-owned leadership. On time, squared away, do what you say. The standard runs at the crew the way it runs at the customer.
- A promote-from-within ladder. We pay for skill at every rung and fill the seat above you from the bench.
- A 401(k) with a 4% company match, vested from day one. Retirement money that is yours the moment it lands, not after a waiting period.
How hiring works
Four steps, no runaround
01
Apply
Fill in the application or call. A person reads it, not a keyword filter.
02
Phone call
A straight conversation about your experience and what you want, within two business days.
03
Ride along
Spend a day on the truck or in the office. You interview us as much as we interview you.
04
Offer
A written offer with pay, schedule, and the license path spelled out.
The path up
Apprentice to the license holder’s seat
The trade has real rungs, and we promote from the bench. Here is the climb, and we pay for skill at every step.
New to the trade? The state sets the hours behind every rung. We wrote up how to become a licensed electrician in Texas with the real TDLR requirements, including the journeyman hour figure most guides get wrong.
Wattsmith is one of the trades businesses operated by Craftline Brands, so the ladder does not necessarily stop at the top of this crew.
- 1
Apprentice
Start with no experience. Paid training, real reps, and we help you register with TDLR.
- 2
Wireman
Run rough-in and finish work to standard. Build speed without ever losing clean.
- 3
Journeyman
Run your own service and project work. Diagnose, quote flat, and own the job.
- 4
Master
Top of the ladderHold the license, set the standard, and take the License Holder of Record seat at the top.
Open roles
4 roles open right now
From first day on the trucks to the office seats that keep them moving. Read the one that fits you and apply. We read every application.
License holder of record
Master Electrician (License Holder of Record)
Hold the license of record and set the technical standard the crew runs to.
Pay
$35 to $38 per hour
Seat filled, view roleHow production pays
One hourly rate, and overtime
Straight hourly, W-2, with overtime at time and a half over 40 hours in a week. A journeyman starts at $35 an hour. There is no commission and no draw, so what you are paid does not depend on what you sell, and your rate rises as you add licenses and take on more responsibility.
You are not in sales here. The flat-rate book and the three-option presentation do the selling; your job is expert diagnosis, honest presentation, and excellent work. The fast, clean electrician out-earns the talker, five-star reviews that name you pay a bonus, and callbacks are reworked at base rate.
Apply
One application, seven short sections
Position and availability, contact and your current address, licensing, work history, experience, how far you will travel and what you carry, and the standard eligibility questions. If you are not sure which seat fits, apply anyway and choose the general application. A person reads every one of these.
Prefer to talk first? Call (210) 446-5446 and ask about joining the crew.
Employment application
Set aside about ten minutes. Have these ready and it goes quickly:
- Your TDLR license number and expiration date, if you hold one
- Dates and employers for your last three jobs
- The earliest date you could start
- Any certifications you carry, such as OSHA 10 or NFPA 70E
Applications are reviewed by a person. Qualified candidates hear from us within two business days.
Ready to do the work right?
If you respect the trade and want to build a career on it, we should talk. Apply and become a Wattsmith.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked
Which guides go deeper on this?
- Electrician Schools in San Antonio, and the Path from Classroom to a Wattsmith Truck
- What electricians earn in Texas, and how our pay compares
- How to Become a Licensed Electrician in Texas
- Texas Electrical License Types and What Each One Lets You Do
- What a Residential Service Electrician Actually Does All Day