Skip to content
Wattsmith Electric

Services

Electricians in San Antonio for every residential and commercial job

Licensed Texas electrical contractor TECL 41806. Every job quoted flat before we start, residential and commercial, from a single outlet to a whole-home rewire.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical services in San Antonio, from one licensed contractor

Wattsmith Electric is a San Antonio electrician for homes and businesses. For houses, see our residential electrician page; when something has stopped working, start with electrical repair; and our license and insurance are on the licensed and insured electrician page.

Texas electrical contractor

TECL 41806

Issued by the Texas Department of Licensing and Regulation.

Residential electrical services

Every service below is done to code and backed by the Wattsmith Standard. Click any one to see exactly how we handle it, what it includes, and the questions we hear most.

Panel Upgrades

Service upgrades and panel replacements sized for modern loads, permitted and inspected.

EV Charger Installation

Level 2 home charger installs with the right circuit, breaker, and clean cable runs.

Whole Home Rewiring

Full and partial rewires for older homes with knob and tube, cloth, or aluminum wiring.

Generator Installation

Standby generator installs and portable interlock or transfer switch hookups.

Surge Protection

Panel-mounted surge protection that guards the whole home from voltage spikes.

Smoke and CO Detectors

Hardwired, interconnected smoke and carbon monoxide detectors installed to code.

Electrical Inspections

Safety and code inspections for buyers, sellers, and homeowners with a plain report.

New Construction Wiring

Full electrical for custom homes and additions, from rough-in through trim.

Commercial electrical services

Commercial electrician in San Antonio for build-outs, repairs, maintenance, EV charging and standby power. Licensed, TECL 41806, with a written price.

Tenant build-outs

New suites and remodels from a white box to an open door: layout, panel and feeder sizing, rough-in, lighting, devices, and the inspections in order. We work from your drawings and your GC's schedule.

Restaurants

Commercial kitchens draw heavy, steady loads and carry their own code rules. We wire cooking lines, hood and fan circuits, walk-in coolers and GFCI protection, and we plan the inspections around your opening date.

Offices and medical

Offices need clean power at every desk, network closets that stay up, and lighting controls the energy code calls for. Medical and dental suites add dedicated equipment circuits and the extra rules for patient care spaces.

Retail and franchise

Retail and franchise build-outs run on a brand's prototype drawings and a fixed opening date. We price from the prototype, flag what the local code changes, and wire signage, displays, point of sale and lighting to the brand's standard.

Our guarantees

  • Our work, guaranteed

    If our workmanship fails within two years, we come back and put it right at no charge. That is our labor, on our word. Parts carry whatever the manufacturer gives them, and we tell you which is which before you approve anything.

  • Done to code

    Everything meets code and we stand behind it, or we come back and fix it.

  • The On-Time Promise

    We hit your window. Miss it with no heads-up, and that is $149 off.

  • $49 Off Your First Service Call

    New customers take $49 off their first diagnostic or service call with Wattsmith Electric. New residential customers only. One per household. Valid on your first service call only. Not combinable with other offers. No cash value. Mention this offer when you book.

  • Send us a neighbor

    Send somebody our way and you both come out ahead: $50 off their first job, and $50 back to you once it is done and paid. No cap and no expiry. Your $50 comes off your next invoice, or back to you if you have no work coming. It is for homeowners and customers, not real estate licensees, and it applies to repair and installation work, not to inspections for a home sale.

The fine print, in full

Questions

Questions about our San Antonio electricians

Straight answers. If you do not see yours, call us and ask.

Are your electricians licensed in San Antonio?

Yes. Wattsmith Electric holds Texas electrical contractor license TECL 41806, issued by the Texas Department of Licensing and Regulation, and every job is done by licensed electricians. The license and our insurance are on our licensing page.

Do you do both residential and commercial electrical work?

Yes. We wire and repair homes, from a single outlet to a whole-home rewire, and we do commercial work from tenant build-outs to maintenance agreements and standby power. Both are listed on this page with a link to each.

Which parts of San Antonio do you serve?

All of San Antonio and the surrounding metro, including the neighborhoods and cities listed on this page, each with its own page about the homes and the electrical work there.

How do you price a job?

Every job is quoted at one flat price, and you approve it before we start. There is no hourly meter running while we work.

Do you pull permits and get the work inspected?

Yes, when the work needs a permit we pull it, and the work is done to the code your address is inspected under, then inspected.

When can you come out?

Every day, 8am to 8pm. Same-day service available during business hours.

How it works

Four steps, from your call to the warranty

  1. 01

    You call

    A real electrician picks up, not a call center. We ask what the panel, the outlet, or the lights are doing, tell you if it sounds urgent, and set a real arrival window instead of a vague all-day block.

  2. 02

    We diagnose

    We show up in the window, find the actual fault instead of guessing, and walk you to the panel or the outlet so you see what we see. Estimates are free. If we have to troubleshoot a fault, that is charged as its own line.

  3. 03

    You get one price

    Before we touch a wire, you get one flat number for the whole job and you approve it. If we open something up and find more, we stop and price it first. The bill matches the number you approved.

  4. 04

    We finish and stand behind it

    We do the work to code, label the circuits, protect your floors, and haul our mess. Then we walk you through what changed, hand you the paperwork, and back it. If it is not right, we come back.

Not sure which service you need?

Tell us what is happening and we will point you to the right fix, then quote it flat. No pressure, no guessing.

(210) 446-5446
Call NowGet a Quote