Skip to content
Wattsmith Electric

Generators

Generac Generator Gas Line: Who Runs It, and What It Takes

November 22, 2026Last updated 5 min readWattsmith Electric · TECL 41806

Key takeaways

  • In Texas, gas piping is plumbing work, so a licensed plumber runs the Generac's gas line.
  • The line has to be sized for the generator's full-load gas use, from the meter or the tank.
  • On our Generac installs the gas line is included in your price, and we schedule the plumber.

A Generac generator gas line is the part of the install people forget to ask about. A standby generator burns natural gas or propane, and the line that feeds it is plumbing, not electrical work. The gas line is included in your price. A licensed plumber runs it, and we schedule the plumber for you. This guide covers what that line involves. As a Generac Aligned Contractor, we sell and install Generac home standby and commercial generators.

Why does a plumber run the gas line, not the electrician?

In Texas, gas piping is plumbing work done by a licensed plumber. Electricians set the generator, install the transfer switch and do the wiring. We schedule the plumber around the electrical work, so you do not have to.

What decides the size of the gas line?

  • How much gas the generator burns at full load, from Generac's spec sheet for the model.
  • How far the unit sits from the meter or tank.
  • What else is on the same gas meter, such as a furnace, a water heater and a range.
  • Whether the meter itself can supply the extra load, or needs upsizing.

A line that is too small starves the generator under load, which is when you need it most. Generac publishes the fuel use for each model; ours are listed on the model pages, such as the Generac 22kW generator.

Natural gas or propane?

Natural gas runs as long as the utility supplies it. Propane runs from a tank you keep filled. Generac rates most models a little lower on natural gas than on propane, which matters for sizing. The Generac generators page shows each model's rating on both fuels.

Is the gas line included in the price?

Yes, on our Generac installs. Installed prices run $12,500 to $16,500 depending on the model, all in with the gas line and permits. A longer run sits higher in its range. The Generac generator cost guide shows each model.

What if the gas meter is too small?

A meter sized for a furnace, a water heater and a range can fall short once a generator is added, because the generator can draw more gas than all of them together at full load. When that happens the gas utility has to upsize the meter, and the plumber coordinates the request. We look at the meter on the sizing visit so it is in the plan from the start, not found on install day.

Where does the line run?

Usually along the outside wall from the meter to the pad, above ground and supported, or underground where the route crosses a yard or a drive. The shorter and straighter the run, the simpler the job, which is one reason the pad's location gets settled on the visit with both trades in mind.

Does the gas line need a permit?

Where the city requires one for gas work, the plumber handles it. The electrical permit, where required, is ours. We confirm what your city asks before we write the price.

What happens on the day?

The plumber runs the line from the meter or tank to the unit, makes the connection, tests it for leaks and confirms the pressure. Then we start the generator. Generac installation day walks through the whole day.

Book a free Generac sizing visit and we look at the meter, the tank and the route on the same visit. Installation details are on Generac generator installation.

Related help

Where to go from here

Ready to get it handled?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote