
Service
Lighting Installation in San Antonio
Recessed cans, ceiling fans, and landscape lighting placed with intent.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Same day
Appointments available
Flat rate
Approved before work begins
TECL 41806
Licensed and insured
8am to 8pm
Open every day
Electrical emergency? Sparks, burning smell, or a dead panel: call (210) 446-5446 now
Emergency service$49 Off
Your First Service Call
New customers take $49 off their first diagnostic or service call with Wattsmith Electric.
New residential customers only. One per household. Valid on your first service call only. Not combinable with other offers. No cash value. Mention this offer when you book.
Our service guarantees
- We hit your window. Miss it with no heads-up, and that is $149 off.
- You approve one flat price before we touch a wire. No hourly meter.
- We protect your floors, haul our mess, and leave the space clean.
- Everything meets code and we stand behind it, or we come back and fix it.
Wattsmith Electric works to the 2023 National Electrical Code and pulls the permit where one is required. How we handle permits, inspections and the workmanship guarantee is on our standards page. The license, the coverage in force and our federal registrations, including the certificate of insurance process for contractors, are on insurance and licensing.
Why it does not pay to wait
Bad connections in fixtures and switches, and DIY wiring that was never to code, run hot behind the cover plate. A switch that feels warm or buzzes is the early warning. Ignored, that path ends at a burned box inside the wall.
Good lighting is not about adding more fixtures. It is about putting the right light in the right place. We lay out recessed cans on a real grid, hang fans that do not wobble, and run landscape lighting that makes the front of your home look the way it should after dark.
We handle the switching, the dimming, and the wiring behind all of it. You get even light, quiet fans, and controls that make sense, not a ceiling full of guesswork.
Ceiling fan and lighting installation we handle
- Recessed can and canless LED layout and installation
- Ceiling fan installation and fan-rated box replacement
- Landscape and pathway lighting with transformers and timers
- Under-cabinet, cove, and accent lighting
- Dimmer and smart switch installation
- Fixture swaps, chandeliers, and high-ceiling work
How do you lay out recessed lighting?
We install recessed cans and canless LED fixtures on a real grid, so the light is even and not a random scatter of cans. How many a room needs depends on ceiling height, room size, and what the room is for, and you see the plan before we cut a hole.
We handle the switching and the dimming behind them, including dimmer and smart switch installation, so the controls make sense.
Can you install a chandelier?
Yes. Fixture swaps, chandeliers, and high-ceiling work are part of the lighting we install, quoted flat by scope.
The box has to carry the fixture. Under the National Electrical Code's box rules, the box must be listed for the weight of the fixture it holds, and a heavy fixture needs support independent of the box. We check the box rather than assuming it.
Ceiling fan installation: a swap, or a new location
If a fan is already up on a fan-rated box and the switching does what you want, a new fan is a straightforward swap. If there is no fan there now, the job is a box rated to carry a fan, cable to it, often a switch leg, and sometimes a ceiling opened and closed again.
We check the box rather than assuming it. The code requires a box listed for fan support under a ceiling fan, because a box made for a light fixture is not built to hold a moving load.
Landscape lighting
Most residential landscape lighting is low voltage: a transformer steps 120 volts down to 12, which is what makes buried runs practical and safe. We size the transformer for the load with headroom, so the system can grow without starting over.
Connections are where these systems fail, so they get direct-burial rated connectors, and the exterior circuit feeding the transformer gets GFCI protection. The price turns on fixture count, run length, transformer size, and whether that exterior circuit already exists.
What you can check yourself first
Before you call, here is what you can safely check on your own. Even if you still call us, you will walk in knowing more than you did.
- Note which switches feel warm or buzz. That is worth flagging.
- Decide the rooms and the look you want: recessed cans, fixtures, dimmers, exterior.
- Check whether an existing box is rated for a ceiling fan before you hang one.
- Set aside any fixtures you already bought so we install exactly what you chose.
Straight pricing
Lighting is quoted flat by scope. We count the fixtures, the switching, and the access, then give you one price.
- Up to three options on a job, each a real way to do it, priced flat. You choose the scope.
- Estimates are free. Troubleshooting is charged as its own line.
- The price you approve is the price you pay.
Lighting Installation
Lighting Installation services
Plan your lighting
Flat-rate quote before any work starts. A Wattsmith electrician calls you back within 15 minutes during business hours.
Where we work
Lighting Installation across the San Antonio metro
We bring lighting installation to San Antonio and the surrounding communities. Find your area below or call and we will confirm we cover you.
- Lighting Installation, Alamo Heights
- Lighting Installation, Stone Oak
- Lighting Installation, Helotes
- Lighting Installation, Schertz
- Lighting Installation, Converse
- Lighting Installation, Universal City
- Lighting Installation, Leon Valley
- Lighting Installation, Boerne
- Lighting Installation, New Braunfels
- Lighting Installation, Cibolo
We do lighting installation across the rest of the metro too, including Live Oak, Selma, Timberwood Park, Hollywood Park, Castle Hills, Windcrest, Kirby, Alamo Ranch, Westover Hills, Medical Center, Bulverde, Fair Oaks Ranch, Terrell Hills, Olmos Park, Shavano Park, Garden Ridge, Spring Branch, Canyon Lake, Seguin, Marion, Saint Hedwig, Adkins, La Vernia, Elmendorf, China Grove, Von Ormy, Somerset, Lytle, Castroville and Floresville.
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Lighting Installation questions
Straight answers. If you do not see yours, call us and ask.
How many recessed lights do I need in a room?
It depends on ceiling height, room size, and what the room is for. We lay it out so the light is even, not a random scatter of cans. You see the plan before we cut a hole.
Can you install a fan where there is only a light?
Yes, but the box has to be fan-rated to carry the weight and the motion. A standard light box is not. We replace it with a proper fan-rated box so the fan stays put.
Do you do landscape lighting?
Yes. We install low-voltage landscape and pathway lighting with the right transformer, timers or photocells, and buried runs that stay hidden and hold up.
Keep exploring
Related work and guides
Related services
Helpful guides
- What recessed lighting costs per light, installed
- What a bathroom exhaust fan costs to install, and where the price actually goes
- What landscape lighting costs to install, and what makes it last
- Under Cabinet Lighting Installation: Hardwired, Plug-In or Low Voltage
- Motion Sensor Security Lighting Installation for Your Home
Need lighting installation done right?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked