How Loud Is a Generac Generator? Published dB Levels by Size

November 1, 2026Last updated 6 min readWattsmith Electric · TECL 41806

Key takeaways

  • Generac's Guardian spec sheets list 61 to 67 dB(A) at 23 feet with the generator at normal load, measured from the front.
  • In Generac's Quiet-Test low speed exercise, the same sheets list 55 to 57 dB(A), and the weekly test runs about five minutes.
  • Generac notes that sound from other sides of the unit may be higher depending on the installation.
  • Placement follows Generac's clearances from the house, doors, windows and air intakes, and that also decides how the unit sounds indoors.

How loud is a Generac generator is a fair question to ask before one goes in beside your house. You will hear it during every outage and, briefly, during its regular self test, and so may your neighbors. Generac publishes sound levels for each size on its spec sheets, measured the same way for every model, so the answer does not have to be a guess. This guide sets out those figures, explains what the weekly test does and how long it runs, and covers the placement rules that decide how much of that sound reaches the inside of your home.

How loud is a Generac home standby generator?

Generac's Guardian spec sheets list 61 to 67 dB(A) at 23 feet, or 7 meters, with the generator running at normal load, measured from the front of the unit. In its low speed weekly exercise, the same sheets list 55 to 57 dB(A). Generac notes that sound from other sides may be higher depending on the installation.

Those are the manufacturer's measured figures, under the conditions its sheets state. They are not a reading at your property line or inside your house, which depend on distance, walls, fences and where the unit faces. They are the right figures for comparing one size with another.

What are the dB levels for each Generac size?

Generac's Guardian spec sheets give these figures in dB(A) at 23 feet, first at normal load and then in Quiet-Test low speed exercise mode. The 10, 14 and 18 kW figures come from the 10 to 18 kW sheet, the 20 to 24 kW figures from the 20 to 24 kW sheet, and the 26 kW from its own sheet.

  • 10 kW: 61 at normal load, 57 in Quiet-Test
  • 14 kW: 65 at normal load, 55 in Quiet-Test
  • 18 kW: 65 at normal load, 55 in Quiet-Test
  • 20 kW: 67 at normal load, 55 in Quiet-Test
  • 22 kW: 67 at normal load, 57 in Quiet-Test
  • 24 kW: 67 at normal load, 57 in Quiet-Test
  • 26 kW: 67 at normal load, 57 in Quiet-Test

Generac has released newer models since those sheets were dated, and its specifications are subject to change, so we read the current sheet for the exact model you choose. Each size's published ratings are on its page from our Generac generators hub.

Why does Generac measure at 23 feet from the front?

Every figure on the sheets is taken the same way, at 23 feet from the front of the generator, so sizes can be compared fairly. Generac's footnote adds that sound taken from other sides may be higher depending on installation parameters, which is why where the unit faces matters as much as which size it is.

Generac's newer spec sheets describe a sound attenuated enclosure and a quiet muffler mounted inside the unit. Those are the parts doing the work, and a damaged or modified enclosure will not sound like the sheet. The difference between the two published modes is also worth reading: the test level sits 4 to 12 dB(A) below the normal load level, depending on the size.

Does an outage sound different from a test?

Yes. During an outage the generator runs at its operating speed carrying the house, so the normal load figure is the one that applies, and it runs for as long as the outage lasts. The regular test runs at the lower Quiet-Test speed for a few minutes. Most of the year, the test is the only time you hear it.

What does the weekly self test sound like?

Generac's Quiet-Test mode runs the engine at a lower speed for its regular exercise. The owner's manual describes the profile: the unit runs at operating speed for about five seconds, drops to the Quiet-Test speed after about 40 seconds, and keeps running until the test is complete, five minutes in all.

So the loudest part of a test is the brief start, and most of it runs at the lower Quiet-Test level. Generac's brochure describes the test as running at a lower speed for a five or twelve minute test while using less fuel. The manual also notes that if Quiet-Test is turned off, the generator exercises at its rated speed instead.

How often does a Generac run its test, and can you change it?

Generac's spec sheets say the exercise runs the generator for five minutes every other week, to keep the engine's seals from drying out between outages, with weekly or monthly settings available. The owner's manual says the exercise runs on the day of the week and at the time of day you set.

Generac's current spec sheets add more settings: an exercise length of 5 to 20 minutes with 5 as the default, and a Smart Exercise option that skips a scheduled test if the generator ran for more than five minutes in the 72 hours before it. After an outage, that saves a test nobody needs.

That means the test does not have to happen at seven on a Saturday morning. Setting it for a weekday afternoon is a small thing that neighbors notice. The manual also says the house does not switch over to the generator during a test unless utility power is actually lost.

Where can a Generac generator go next to the house?

Generac's spec sheets say its Guardian units are listed for installation as close as 18 inches to a structure, provided they are located away from doors, windows and fresh air intakes and in accordance with local codes. Its buyer's guide gives the fuller picture an installer works to.

  • 18 inches from the house, and 60 inches from doors, windows and fresh air intakes, per Generac's buyer's guide
  • 36 inches clear in front so a technician can service it, and at least 3 feet from utility meters, air conditioning units and anything combustible
  • Mechanical and gravity outdoor air intake openings at least 10 feet horizontally from the enclosure, per the owner's manual
  • Shrubs and tall grass cleared within 3 feet of the louvers on the sides of the enclosure

Those clearances exist for exhaust and service first, but they shape noise too. A unit set beside a bedroom window is heard differently from one at the end of a garage wall. Generac's manual also says to always use a battery operated carbon monoxide alarm indoors.

How can you keep generator noise down at your house?

  • Choose the location with the sound in mind as well as the clearances, away from bedrooms and the neighbor's patio where the setbacks allow
  • Set the exercise for a time of day that suits the household and the street
  • Keep Quiet-Test on, so the regular test runs at the lower speed
  • Size the unit to the load list rather than oversizing it

If quiet matters most for short outages, a battery is silent, and Generac says a paired generator starts only when the battery runs low. The trade offs are in our standby generator vs home battery guide.

Get the placement settled at a sizing visit

We sell and install Generac home standby and commercial generators. At a free Generac sizing visit we walk the house with you, mark where the unit can go within Generac's clearances, and pick the spot that suits the house and the neighbors, then give you a size and a written price with no obligation. The Generac generator cost guide explains what moves that price, and the installation itself is on our Generac generator installation page.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

How many decibels is a Generac 22kW generator?

Generac's spec sheet lists the Guardian 22 kW at 67 dB(A) at 23 feet at normal load and 57 dB(A) in Quiet-Test low speed exercise, measured from the front of the unit.

Is a Generac generator loud during its weekly test?

The test runs about five minutes, mostly at the lower Quiet-Test speed after a brief start at operating speed. Generac's sheets list 55 to 57 dB(A) at 23 feet for that mode on its Guardian models.

Can I change when my Generac runs its test?

Yes. Generac's owner's manual says the exercise runs on the day and at the time of day you set, and its spec sheets list weekly, every other week and monthly settings.

How close to my house can a Generac generator go?

Generac lists its Guardian units for installation as close as 18 inches to a structure, away from doors, windows and fresh air intakes and in line with local codes. Its buyer's guide puts doors, windows and fresh air intakes at 60 inches.

Related help

Where to go from here

Ready to get it handled?