Skip to content
Wattsmith Electric

Home and business standby generators, Schertz

Generac generator installation Schertz sized to your loads and tested before we leave

Home and business standby generators in Schertz, sized to what you need running in an outage, installed with an automatic transfer switch and tested under load. GVEC names Schertz among the areas its services cover. The utility on your electric bill is the one we coordinate with, and we check it before the visit.

We sell and install Generac home standby and commercial generators.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Working in Schertz

Does a generator installer have to register with the City of Schertz?

Yes. Schertz requires every contractor doing work that needs a permit to register with the city, and the registration runs by calendar year, January 1 through December 31. Permits and inspections go through the Inspections Division on the City of Schertz Portal, and we confirm what the city requires before we write the price.

A Generac install in Schertz

We list what you want running in an outage, check the panel and the service, and recommend the Generac unit and the transfer switch to match. Then we set the unit, mount and wire the automatic transfer switch, run the wiring between the generator, the switch and your panel, and start it up and test it under load before we leave. For a business, the same sizing and transfer switch work applies at commercial scale.

  • A load list room by room
  • Automatic transfer switch at the service
  • Start up and a transfer test under load

The utility side in Schertz

GVEC names Schertz among the areas its services cover. The utility on your electric bill is the one we coordinate with, and we check it before the visit. GVEC asks members with a backup generator to let it know. Its generator agreement says the generator and transfer switch are installed only by a Texas licensed electrician, outside GVEC's easement and properly grounded, that a transfer switch never goes on a GVEC pole, and that no one installs a meter collar or opens GVEC's meter. The transfer switch goes in after GVEC is notified, so it can arrange a temporary disconnect.

Permits in Schertz

In Schertz, permits and inspections go through the Inspections Division on the City of Schertz Portal. We confirm what the city requires before we write the price.

Contractor registration

Schertz requires every contractor doing work that needs a permit to be registered with the city, and the registration runs by calendar year, from January 1 through December 31, with electrical contractors on the list of trades. The registration is in place before the permit is pulled, so it never holds up a start date.

Questions about generac generator installation in schertz? Call or get a quote.

Generator quote

How do I book a free Generac sizing visit in Schertz?

Tell us what you want to keep running in an outage. We call back to set up the sizing visit.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do people ask about Generac generators in Schertz?

Straight answers. If you do not see yours, call us and ask.

GVEC names Schertz among the areas its services cover. The utility on your electric bill is the one we coordinate with, and we check it before the visit.

Call NowGet a Quote