Skip to content
Wattsmith Electric

Generator Installation | Bexar County

Generator Installation in Universal City, TX

Standby and portable hookups wired safe, with a transfer switch done right. Serving Universal City and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

When you need generator installation in Universal City, you want it done once and done right. Straight pricing, clean work, and a warranty that means something.

Universal City runs on Randolph, and that means a lot of veterans and active duty families. That is our crowd. On time, straight pricing, clean work. Panel upgrades, EV chargers, and repairs done the way you would expect from another veteran.

Every generator installation job in Universal City gets the Wattsmith Standard: on time, flat rate before work starts, a clean job site, and code-right work or we make it right.

What generator installation in Universal City includes

  • Standby generator installation with automatic transfer switch
  • Portable generator interlock kits and inlet boxes
  • Manual transfer switch installation
  • Dedicated circuits for critical loads
  • Gas and pad coordination with your other trades
  • Permit and inspection handled

What gets settled before a home standby generator goes in at a Universal City address?

First, what the city and CPS Energy will ask of the system. Texas changed that in 2025: Senate Bill 1252 limits what a city may require for a home backup system of up to 50 kilowatts, while a municipally owned utility may still set rules in its own service area. CPS Energy describes itself as a public power company, so we confirm with both the city and CPS what applies to your address before we write the price.

CPS has a back-up generator application that the electrical contractor submits, with a three-line diagram and transfer switch specifications, and it finishes with a commissioning test on site. If GVEC serves you instead, we check its rules.

Then we size the unit and the transfer switch to the circuits you want to keep. Bexar County was in FEMA's February 2021 winter storm declaration, DR-4586, the kind of long outage a standby unit is built for.

Straight pricing

Free estimate. We come look at the panel, the load list, and the set location, and give you a fixed price before anything starts.

FAQ

Generator Installation in Universal City, answered

Straight answers. If you do not see yours, call us and ask.

Do you handle the gas line too?

We wire the electrical and coordinate with a licensed gas fitter for the fuel side. We keep the trades in sync so the install lands on schedule.

Do you charge extra to come out to Universal City?

No trip-charge games. Universal City is inside our service area, so you get straight flat-rate pricing on the work itself, quoted before we start.

Do you offer emergency electrical service in Universal City?

We keep room for urgent calls in Universal City. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.

Generator Installation in Universal City, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote