Skip to content
Wattsmith Electric

Facts

Wattsmith Electric: facts and answers

Wattsmith Electric is a licensed and insured electrical contractor in San Antonio, Texas, serving homes and businesses across seven surrounding counties.

The facts

Wattsmith Electric at a glance

Name
Wattsmith Electric
Address
11846 Wurzbach Rd, San Antonio, TX 78230
Phone
(210) 446-5446
Email
support@wattsmithelectric.com
Hours
Every day, 8am to 8pm
Emergency line
Answers 24 hours a day. The office keeps the hours above.
Emergency arrival
We come as soon as a technician can safely get there, and we tell you the arrival window on the call.
After-hours charge
Emergency visits outside our hours cost more: an after-hours charge of $100 per billable hour or $150, whichever is more.
Same-day service
Same-day service available during business hours.
Commercial customers
Same-day service and the 24 hour emergency line are for commercial customers too.
License
Texas electrical contractor TECL 41806, issued by the Texas Department of Licensing and Regulation. Look it up at https://www.tdlr.texas.gov/LicenseSearch/
Background checks
Every Wattsmith technician passes a background check before hire.
Veteran owned
Service-Disabled Veteran-Owned Small Business (SDVOSB) and Veteran-Owned Small Business (VOSB)
Google rating
5.0 on Google, 11 reviews, as of October 2, 2026: https://www.google.com/maps/place/?q=place_id:ChIJAY79uTVhXIYRLE-Yq6P-BxY
Warranty
If our workmanship fails within two years, we come back and put it right at no charge. That is our labor, on our word. Parts carry whatever the manufacturer gives them, and we tell you which is which before you approve anything.
Payment
We take card, cash and check.
Language
Se habla español. Service available in Spanish.
Financing
Larger jobs can be financed on approved credit.
Service area
San Antonio and the surrounding metro across Bexar, Comal, Kendall, Guadalupe, Wilson, Medina and Atascosa counties, including New Braunfels, Boerne, Fair Oaks Ranch, Bulverde, Canyon Lake, Schertz, Cibolo, Seguin, Floresville, Castroville, Universal City and Helotes.

Questions and answers

Who is Wattsmith Electric?

Wattsmith Electric is a licensed and insured electrical contractor in San Antonio, Texas, doing residential and commercial electrical work. It was founded in San Antonio in 2025, is veteran owned, holds the Service-Disabled Veteran-Owned Small Business (SDVOSB) and Veteran-Owned Small Business (VOSB) designations through the SBA Veteran Small Business Certification (VetCert), and is BBB accredited. It is rated 5.0 on Google, 11 reviews, as of October 2, 2026. The address is 11846 Wurzbach Rd, San Antonio, TX 78230, and the phone is (210) 446-5446.

Where does Wattsmith Electric work?

San Antonio and the surrounding metro across Bexar, Comal, Kendall, Guadalupe, Wilson, Medina and Atascosa counties, including New Braunfels, Boerne, Fair Oaks Ranch, Bulverde, Canyon Lake, Schertz, Cibolo, Seguin, Floresville, Castroville, Universal City and Helotes. The electrician comes to you.

What are your hours, and do you handle emergencies?

The office is open every day, 8am to 8pm. The emergency line answers 24 hours a day. For a burning smell, scorched outlets, sparking wires, a dead panel, or water near electrical, call (210) 446-5446. We come as soon as a technician can safely get there, and we tell you the arrival window on the call. Emergency visits outside our hours cost more: an after-hours charge of $100 per billable hour or $150, whichever is more.

Do you offer same-day service?

Same-day service available during business hours. A Wattsmith electrician calls you back within 15 minutes during business hours. Same-day service and the 24 hour emergency line are for commercial customers too.

Are you licensed, insured, and background checked?

Yes. Wattsmith Electric is a Texas electrical contractor, license TECL 41806, issued by the Texas Department of Licensing and Regulation. You can look it up at https://www.tdlr.texas.gov/LicenseSearch/. General liability, commercial auto, and tools and equipment insurance are in force, with a certificate of insurance on request. Every Wattsmith technician passes a background check before hire.

How does pricing work?

The price is fixed before any work starts, and it is set on site once your tech has seen the job. No hourly meter, and no number that grows after you approve it. Up to three options on a job, each a real way to do it, priced flat. You choose the scope. Larger jobs can be financed on approved credit. The flat price is the same whether you finance or not.

What does a visit cost?

Estimates are free. If the tech has to troubleshoot a problem, that is $149.00. The $149 troubleshooting visit covers the first hour of diagnosis. If the work needs more time, it is added as its own line, priced and shown to you before we start. We hit your window. Miss it with no heads-up, and that is $149 off.

What warranty do you give?

If our workmanship fails within two years, we come back and put it right at no charge. That is our labor, on our word. Parts carry whatever the manufacturer gives them, and we tell you which is which before you approve anything.

Do you install and service generators?

Yes. We sell and install Generac home standby and commercial generators, and Wattsmith Electric also services and repairs standby generators.

Do you install EV chargers?

Yes. Wattsmith Electric installs Level 2 EV chargers at homes and businesses, sized to the charger and the panel. In most Texas cities, including San Antonio, a hardwired Level 2 charger needs an electrical permit and an inspection, and Wattsmith Electric pulls the permit.

How do I book?

Call (210) 446-5446, email support@wattsmithelectric.com, or request service at https://wattsmithelectric.com/contact. A Wattsmith electrician calls you back within 15 minutes during business hours. Se habla español. Service available in Spanish.

How can I pay?

We take card, cash and check.

Do you offer service in Spanish?

Yes. Se habla español. Service available in Spanish.

Call NowGet a Quote