Key takeaways
- Generac's Guardian home standby line we install runs from 14kW to 26kW, all air-cooled.
- Larger homes that want nearly everything running through a long outage sometimes move up to a liquid-cooled unit.
- Liquid-cooled units use a radiator and coolant like a car engine, and they are built for heavier, longer running.
Generac air-cooled vs liquid-cooled is a question that comes up once a load list gets long. As a Generac Aligned Contractor, we sell and install Generac home standby and commercial generators. For most homes the answer is air-cooled, and the sizes we install are on the Generac generators page. This guide is about when that changes.
What does air-cooled mean?
An air-cooled generator cools its engine with air moved by a fan, the way a lawn mower engine is cooled. Generac's Guardian home standby units are air-cooled. They are compact, sit beside the house on a pad, and cover the loads of most homes, including central air conditioning sized to the unit.
Which Guardian sizes do most homes use?
We install the Guardian from the 14kW to the 26kW. Generac rates each one a little lower on natural gas than on propane on most sizes, so a house on natural gas sizes from the natural gas figure. The Generac 26kW generator is the largest in the line we install.
When does a home outgrow air-cooled?
- Several large air conditioning systems that all need to run at once.
- A long list of big loads: a pool, a large well pump, electric cooking and a shop.
- A wish to run nearly everything for a long outage without load management.
Load management often keeps a house in the air-cooled range: it holds off a large load, like one AC system, until there is room for it. That is a sizing conversation, and it is why we list loads on the visit.
What does liquid-cooled mean?
A liquid-cooled generator uses a radiator and coolant like a car engine. These units are larger, heavier and built for heavier, longer running. They are common on commercial jobs and on the largest homes. They have their own maintenance schedule, with coolant and belts on the list.
Does air-cooled mean it cannot run for a long outage?
No. An air-cooled Generac runs through long outages on natural gas as long as the gas and the engine oil hold up, and the owner's manual sets the oil checks during an extended run. The difference is the duty: liquid-cooled engines are built to carry heavier loads for longer stretches with less strain, which is why the largest homes and businesses use them.
For most San Antonio homes, a correctly sized air-cooled unit with load management for one air conditioning system carries what matters through a storm.
How do maintenance and running time compare?
Both need oil, filters, plugs and a battery at the intervals in the owner's manual. Liquid-cooled units add the cooling system. Our guide on what a Generac tune-up checks covers the yearly visit.
How do I know which one my house needs?
From the load list, not the square footage. Book a free Generac sizing visit, and we list what you want running and recommend the unit. The Generac generator cost guide shows the installed range for each Guardian size, and Generac generator installation covers the work.