
Wilson County
Electrician in Floresville, TX
Licensed electrical service for Floresville, quoted flat before we start.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Same day
Appointments available
Flat rate
Approved before work begins
TECL 41806
Licensed and insured
8am to 8pm
Open every day
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Floresville is the Wilson County seat, sitting on US 181 with FM 775 running east and the San Antonio River passing west of town. There is a historic courthouse square at the center and ranch land in every direction from it.
In town it is panel upgrades, grounding, and rewires for older homes. Out on the acreage it is wells, barns, shops, and generators. We make the drive and quote the whole job flat before we start. Same split up the road in La Vernia and west toward Elmendorf.
On the ground
What Floresville actually needs
Courthouse-square vintage homes
The older homes near the center have been added to for generations, and the panel usually tells the story. We read the whole system before quoting a piece of it.
Ranch properties are multi-building systems
House, barn, shop, well, gate. One plan, sized for the distances, trenched once. That is the only way it comes out sensible.
In town and out of town are different utilities
The provider inside the city and the provider out on the county roads are not the same, and the line between them is not the city limit. That decides how a new service is applied for and how long it takes, so we confirm it for your address before we commit to a date.
Electrical services in Floresville
The full range of Wattsmith work, available across Floresville. Click any service for the details.
- Electrical Repair
- Panel Upgrades
- EV Charger Installation
- Whole Home Rewiring
- Lighting Installation
- Generator Installation
- Surge Protection
- Outlets and GFCI
- Smoke and CO Detectors
- Electrical Inspections
- New Construction Wiring
Standby power: Generac generator installation Floresville, with every installed price in the Generac generator cost guide.
Local and ready
Call Wattsmith Electric and get a flat-rate quote for your Floresville project today.
Offers
Flat price offers in Floresville
Prices from our price book. Your tech confirms the final price on site, and you approve it before any work starts.
- OfferElectrical Troubleshooting$149 covers the first hourSee the offer
- OfferReal Estate Electrical Inspection$563 flat, written report includedSee the offer
- Offer200 Amp Panel UpgradeStarting at $6,039See the offer
- OfferLevel 2 EV Charger InstallationStarting at $1,209See the offer
- OfferGenerator Interlock and InletStarting at $1,789See the offer
- OfferWhole-Home Surge ProtectionStarting at $629See the offer
The Wattsmith Standard
How we do the work
Four things we do on every job, and what happens when we miss one.
The Wattsmith On-Time Promise
We show up in the window we give you. If something moves it, you hear it from us first, with a reason. Miss the window with no heads-up, and your diagnostic fee is on us.
Flat rate before work starts
You get the price up front and you approve it before we touch a wire. No hourly meter running while you watch.
Clean job site
We protect your floors, haul our mess, and leave the space the way we found it. You should not be able to tell we were there, except the work is done right.
Code-right, or we make it right
Everything we install meets code and we stand behind it. If it is not right, we come back and fix it. That is the whole deal.
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Floresville electrical questions
Straight answers. If you do not see yours, call us and ask.
Are you licensed to work in Floresville?
Yes. We are a licensed and insured Texas electrical contractor and we pull the proper permits for work in Floresville wherever code requires it.
Do you actually service Floresville?
Yes. Floresville is part of our regular San Antonio metro service area. You get the same flat-rate pricing and the same crew that serves the rest of the region.
Every electrical service our San Antonio electricians offer
Need an electrician in Floresville?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked
Nearby areas