Skip to content
Wattsmith Electric
A neatly wired electrical breaker panel with color-coded conductors

Service

Whole House Surge Protector Installation in San Antonio

Stop the spikes at the panel before they reach your electronics.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Same day

Appointments available

Flat rate

Approved before work begins

TECL 41806

Licensed and insured

8am to 8pm

Open every day

Electrical emergency? Sparks, burning smell, or a dead panel: call (210) 446-5446 now

Emergency service

$49 Off

Your First Service Call

New customers take $49 off their first diagnostic or service call with Wattsmith Electric.

New residential customers only. One per household. Valid on your first service call only. Not combinable with other offers. No cash value. Mention this offer when you book.

Our service guarantees

  • We hit your window. Miss it with no heads-up, and that is $149 off.
  • You approve one flat price before we touch a wire. No hourly meter.
  • We protect your floors, haul our mess, and leave the space clean.
  • Everything meets code and we stand behind it, or we come back and fix it.

The On-Time Promise fine print, in full

Wattsmith Electric works to the 2023 National Electrical Code and pulls the permit where one is required. How we handle permits, inspections and the workmanship guarantee is on our standards page. The license, the coverage in force and our federal registrations, including the certificate of insurance process for contractors, are on insurance and licensing.

Why it does not pay to wait

A single surge from a storm or a grid event can take out everything hardwired at once: the HVAC control board, the oven, the well pump, a smart panel. A plug strip protects none of that. The gear you lose in one event costs far more than the protection would have.

Power strips protect one device. They do nothing for your HVAC, your oven board, your garage door, or the LED drivers in your ceiling. A single surge from a storm or a utility switch can take out thousands of dollars of electronics in an instant.

We install a whole-home surge protective device at the panel. It clamps the spike before it spreads through the house. It is a small install with a large payoff, and it pairs perfectly with a panel upgrade.

What a whole house surge protector installation includes

  • Type 2 whole-home surge protective device at the panel
  • Point-of-use protection for sensitive equipment
  • Proper grounding and bonding verification
  • Coordination with a panel upgrade when needed
  • Status indicator so you know it is still protecting

What you can check yourself first

Before you call, here is what you can safely check on your own. Even if you still call us, you will walk in knowing more than you did.

  • List the expensive hardwired gear: HVAC boards, oven, well pump, smart home panel.
  • Check whether you already have any surge device at the panel.
  • Note if you are on a line that flickers or browns out during storms.
  • Keep power strips for the electronics, and ask us about the panel-level device that protects the rest.

Straight pricing

Surge protection is a flat-rate install. Bundle it with a panel upgrade and it goes in while the panel is open.

  • Up to three options on a job, each a real way to do it, priced flat. You choose the scope.
  • Estimates are free. Troubleshooting is charged as its own line.
  • The price you approve is the price you pay.

How our pricing works

Protect your home's electronics

Flat-rate quote before any work starts. A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

Surge Protection questions

Straight answers. If you do not see yours, call us and ask.

Does whole-home surge protection actually work?

Yes. A panel-mounted device clamps high-voltage spikes before they travel through your circuits. It protects the hardwired equipment a power strip never touches, like your HVAC and appliances.

Do I still need power strips?

A layered approach is best. The panel device handles the big spikes. Point-of-use protection adds a second layer for sensitive gear like computers and media. We can set up both.

How long does a surge device last?

It depends on how many hits it takes. Quality units have an indicator light. When it changes, you replace the module, not the whole unit. We show you what to watch for.

Need surge protection done right?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote