Skip to content
Wattsmith Electric
A downtown San Antonio glass high-rise at dusk on Houston Street

San Antonio Metro

Electrical Contractor for the San Antonio Metro

A licensed electrical contractor in San Antonio, TECL 41806, covering the surrounding communities across seven counties. Flat-rate pricing, quoted before the work starts.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Same day

Appointments available

Flat rate

Approved before work begins

TECL 41806

Licensed and insured

8am to 8pm

Open every day

What working in this metro actually involves

San Antonio is not one housing stock, it is several sitting next to each other. Inside Loop 410 there are homes wired before an equipment grounding conductor was required, on original services, with panels from manufacturers that no longer exist. The 1970s and 1980s subdivisions that ring them have aluminum branch wiring and panels that were sized for a house with one air conditioner and no EV. The newer build-out north and west has modern wiring and a different problem: capacity, because the loads people are adding now were not on anyone’s list when the service was sized.

That is why we quote after looking rather than over the phone. The same request means different work depending on which of those three houses you live in.

The other constant here is the utility and the city. Permitted electrical work in San Antonio is inspected by the city, and anything touching the service is coordinated with CPS Energy. Both of those are our job to handle, not yours.

Need one repair today rather than a contractor for a project? Our home page is the quickest way to book a San Antonio electrician.

Services

Electrical services from your San Antonio electrical contractor

Residential and commercial, permitted and inspected, quoted flat before we start.

Electrical Repair in San Antonio

Diagnostics and repair for breakers, outlets, flickering lights, and dead circuits.

Panel Upgrades in San Antonio

Service upgrades and panel replacements sized for modern loads, permitted and inspected.

EV Charger Installation in San Antonio

Level 2 home charger installs with the right circuit, breaker, and clean cable runs.

Whole Home Rewiring in San Antonio

Full and partial rewires for older homes with knob and tube, cloth, or aluminum wiring.

Lighting Installation in San Antonio

Recessed, landscape, and ceiling fan installations laid out and wired clean.

Generator Installation in San Antonio

Standby generator installs and portable interlock or transfer switch hookups.

Surge Protection in San Antonio

Panel-mounted surge protection that guards the whole home from voltage spikes.

Outlets and GFCI in San Antonio

New outlets, GFCI protection, and USB receptacles for kitchens, baths, and exteriors.

Smoke and CO Detectors in San Antonio

Hardwired, interconnected smoke and carbon monoxide detectors installed to code.

Electrical Inspections in San Antonio

Safety and code inspections for buyers, sellers, and homeowners with a plain report.

New Construction Wiring in San Antonio

Full electrical for custom homes and additions, from rough-in through trim.

Emergency

Something is burning, sparking, or dead

A burning smell at the panel, a scorched outlet, or half the house dark is not a next-week problem. We run emergency calls across the metro, and the same flat-rate rule applies: you get the number before we start.

Financing

When the work is bigger than the moment

A panel replacement or a rewire is real money and it rarely arrives at a convenient time. Financing is available, and the quote is the same number whether you pay up front or finance it.

Working here

Hiring electricians in San Antonio

We hire master, journeyman, wireman, and apprentice electricians in this metro, W-2 with real pay ranges published on the role pages rather than held back for the interview.

Wattsmith Electric

Address
11846 Wurzbach Rd, San Antonio, TX 78230
Serving San Antonio and the surrounding metro
Hours
Every day, 8am to 8pm. Emergency service available.
Licensing
Licensed and insured Texas electrical contractor. TECL 41806.

Tell us what the house is doing

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote