Lighting Installation
Outdoor lighting installation in San Antonio
Outdoor lighting installation by a licensed electrician, TECL 41806: landscape, security, motion sensor, patio and soffit lights in weatherproof boxes with ground fault protection, at one flat price before work starts.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Outdoors, water and sun do the damage. A fixture that is fine in a hallway will fail in a season on a fence line, so outdoor work starts with parts rated for wet or damp locations, boxes and covers made for the weather, and ground fault protection on the circuit that feeds them.
We light walkways and landscaping, put floodlights and motion sensor lights where they cover the approaches to the house, and add patio and soffit lighting for the places you use after dark. Permits are handled where the work needs one.
What outdoor lighting installation covers
- Landscape and path lighting
- Security floodlights
- Motion sensor lights
- Patio, porch and pergola lighting
- Soffit and eave lighting
- Timers, photocells and switching
How outdoor lighting installation goes
- 1.You walk us through where you want light and what it is for: safety, getting around, or the look of the yard.
- 2.The electrician plans fixture spots, the circuit and the wire route outside.
- 3.You get one flat price for the outdoor lighting and approve it before work starts.
- 4.Fixtures are mounted in weatherproof boxes, the circuit is protected, and every light and control is tested after dark settings are set.
A veteran-owned electrician serving San Antonio, including Alamo Heights, Stone Oak and Helotes.
FAQ
Common questions
Straight answers. If you do not see yours, call us and ask.
Yes. A fixture outside has to be rated for the spot: damp locations under a covered porch, wet locations where rain reaches it. The boxes and covers have to match, or water gets in.
Ready for an electrician who does it right?
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked