Skip to content
Wattsmith Electric

Commercial electrical

Emergency lighting installation in San Antonio

Emergency lighting installation by a licensed electrical contractor, TECL 41806: battery backup egress lights and exit signs installed, tested and repaired for fire inspections in offices, retail and restaurants, at one flat price before work starts.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Emergency lights and exit signs sit unnoticed for years and then have one job on the worst day a building has: to light the way out when the power fails. A unit that only works on paper is no use then. Each one is placed to light the path, wired so it senses the loss of power in its area, and tested on battery before we leave.

Fire inspectors look for exit signs at each exit and along the path where the way out is not plain to see, egress lights that come on when tested, and a record of the monthly and annual tests. We install new units, replace failed batteries and fixtures, and add signs where a remodel moved a wall or a door, so you go into the inspection knowing where the building stands.

What emergency lighting installation covers

  • Battery backup emergency lights
  • Exit signs and combination exit and emergency units
  • Exterior lighting at exit doors
  • Replacement batteries and failed units
  • Signs and lights added after a remodel
  • Testing, with a written record of each unit

How emergency lighting installation goes

  1. 1.You tell us about the building and the inspection, or send us the inspector's list.
  2. 2.The electrician walks each exit and the path to it, tests every unit on battery, and notes what is missing or has failed.
  3. 3.You get one flat price for the emergency lighting installation and repairs and approve it before work starts.
  4. 4.Units are installed or repaired, each one is tested on battery, and you get a written record of what was tested and what was done.

A veteran-owned electrician serving San Antonio, including Alamo Heights, Stone Oak and Helotes.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

The Life Safety Code calls for a functional test of battery emergency lighting every month, for at least 30 seconds, and a full 90 minute test once a year, with a written record of each. Most units have a test button for the monthly check.

Ready for an electrician who does it right?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote