Skip to content
Wattsmith Electric

Panel Upgrades | Comal County

Panel Upgrades in New Braunfels, TX

100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving New Braunfels and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

When you need panel upgrades in New Braunfels, you want it done once and done right. Straight pricing, clean work, and a warranty that means something.

New Braunfels is booming, and it shows in the work. New construction and additions on one side, historic downtown homes needing careful rewires on the other. We handle both, from rough-in to a delicate old-house panel swap.

From the first call to the final walkthrough, your panel upgrades in New Braunfels is handled by licensed, insured, background-checked techs who treat your home like their own.

What panel upgrades in New Braunfels includes

  • 100 amp to 200 amp service upgrades
  • Panel and meter combo replacements
  • Federal Pacific and Zinsco panel replacement
  • Sub-panel installation for shops, additions, and pools
  • Whole-home surge protection added at the panel
  • Permit, utility coordination, and inspection handled

Who sets the meter date for a panel upgrade in New Braunfels?

Your electric utility does, and for most of the city that is New Braunfels Utilities. NBU does not release orders to its electric crews until the meter loop passes inspection, and it wants a copy of the approved city inspection before it books its own. South of County Line Road the provider is GVEC, and out FM 306 to the west it is PEC, so we check your address first.

Census figures say about 63 percent of the city's homes went up in 2000 or later, so many upgrades here are about room for new loads such as a charger, a shop or a pool. The roughly 3,500 homes built before 1960 are where an original small service is most likely still in place. The city lists the 2020 National Electrical Code among its adopted standards, and that edition calls for surge protection and an outside emergency disconnect on a replaced service, so we lay both out from the start.

Straight pricing

Free estimate. We come look at the panel, the meter, and the service, and give you a fixed price before anything starts.

FAQ

Panel Upgrades in New Braunfels, answered

Straight answers. If you do not see yours, call us and ask.

Do I need a 200 amp panel?

If you are adding an EV charger, electric heat, or a large addition, almost always yes. We size the service to your real loads plus room to grow, not a guess.

Can you handle both my home and my rental in New Braunfels?

Absolutely. We work with homeowners and landlords across New Braunfels, from a single repair to a full panel upgrade or a turn between tenants.

How fast can you get to New Braunfels?

For most calls in New Braunfels we can offer same-day or next-day service during business hours. Call and we will give you the soonest honest window.

Panel Upgrades in New Braunfels, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote