Panel Upgrades | Kendall County
Panel Upgrades in Boerne, TX
100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving Boerne and the San Antonio metro.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
When you need panel upgrades in Boerne, you want it done once and done right. Straight pricing, clean work, and a warranty that means something.
Boerne is ranch country. Long service runs, well and septic pumps, gates, barns, and shops. We plan power across the whole property, set sub-panels where they belong, and back it all with generator options for when the grid drops.
Every panel upgrades job in Boerne gets the Wattsmith Standard: on time, flat rate before work starts, a clean job site, and code-right work or we make it right.
What panel upgrades in Boerne includes
- 100 amp to 200 amp service upgrades
- Panel and meter combo replacements
- Federal Pacific and Zinsco panel replacement
- Sub-panel installation for shops, additions, and pools
- Whole-home surge protection added at the panel
- Permit, utility coordination, and inspection handled
How does a 200 amp service upgrade work with Boerne Utilities?
In the City of Boerne's electric area, a bigger service starts with paperwork at the utility. The city's Utility Services Contract has a box for a new or increased permanent service and sets 200 amps as the minimum for permanent service. The electrical permit comes from Permitting and Code Compliance through the city's online portal.
Before work begins, the electrician and the owner meet the Utilities Department on site to go over city standards, and the meter can is handed out at that meeting. The utility's specifications list the wire and conduit for 200 and 320 amp meter loops, and the meter location has to be approved first. Once the city inspects the new service, Permitting releases it to Utilities, which issues the work order to set the meter.
If Bandera Electric serves your address, the cooperative takes a Service Upgrade request instead.
Straight pricing
Free estimate. We come look at the panel, the meter, and the service, and give you a fixed price before anything starts.
Nearby
Panel Upgrades in other areas
More in Boerne
Other services in Boerne
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Panel Upgrades in Boerne, answered
Straight answers. If you do not see yours, call us and ask.
Do I need a 200 amp panel?
If you are adding an EV charger, electric heat, or a large addition, almost always yes. We size the service to your real loads plus room to grow, not a guess.
Can you handle both my home and my rental in Boerne?
Absolutely. We work with homeowners and landlords across Boerne, from a single repair to a full panel upgrade or a turn between tenants.
How fast can you get to Boerne?
For most calls in Boerne we can offer same-day or next-day service during business hours. Call and we will give you the soonest honest window.
Panel Upgrades in Boerne, quoted flat
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked