Panel Upgrades | Bexar County
Panel Upgrades in Leon Valley, TX
100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving Leon Valley and the San Antonio metro.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Wattsmith Electric handles panel upgrades in Leon Valley with no guessing and no surprise invoices. Honest flat-rate work from a crew that shows up squared away.
Leon Valley homes were built when a 100 amp panel was plenty. It is not anymore. We upgrade services, replace tired panels, and bring grounding and outlets up to current code so the house keeps up with how you live now.
We serve Leon Valley out of San Antonio with the same crew and the same flat-rate honesty we bring to every community in the metro. Your quote is your price.
What panel upgrades in Leon Valley includes
- 100 amp to 200 amp service upgrades
- Panel and meter combo replacements
- Federal Pacific and Zinsco panel replacement
- Sub-panel installation for shops, additions, and pools
- Whole-home surge protection added at the panel
- Permit, utility coordination, and inspection handled
Who signs off on a panel upgrade in Leon Valley?
Two parties sign off. Leon Valley's Planning and Zoning department issues the electrical permit and inspects the new panel, and CPS Energy controls the meter. CPS Energy's renovation steps say it needs your city inspection before it turns on permanent service, and that without one it installs the meter in a locked position.
The city inspects between 10 a.m. and 2 p.m. on weekdays and wants each request called in by 3 p.m. the workday before. We book that inspection as soon as the panel is set and line up the CPS Energy reconnect right behind it, so your power is off for as short a time as we can manage.
More than half of Leon Valley's housing was built before 1980, by Census estimates. Many of those homes still carry a panel sized for a house with far less air conditioning, cooking and charging load than yours has now. The replacement is built to the 2023 National Electrical Code that the city lists.
Straight pricing
Free estimate. We come look at the panel, the meter, and the service, and give you a fixed price before anything starts.
Nearby
Panel Upgrades in other areas
More in Leon Valley
Other services in Leon Valley
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Panel Upgrades in Leon Valley, answered
Straight answers. If you do not see yours, call us and ask.
Do I need a 200 amp panel?
If you are adding an EV charger, electric heat, or a large addition, almost always yes. We size the service to your real loads plus room to grow, not a guess.
How fast can you get to Leon Valley?
For most calls in Leon Valley we can offer same-day or next-day service during business hours. Call and we will give you the soonest honest window.
Can you handle both my home and my rental in Leon Valley?
Absolutely. We work with homeowners and landlords across Leon Valley, from a single repair to a full panel upgrade or a turn between tenants.
Panel Upgrades in Leon Valley, quoted flat
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked