Skip to content
Wattsmith Electric

Panel Upgrades | Bexar County

Panel Upgrades in Converse, TX

100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving Converse and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Need panel upgrades in Converse? Wattsmith Electric quotes the number before we start, then does the work to code. Flat-rate pricing, no hourly meter.

Converse is a solid, family-first part of the Northeast Side. Most calls here are the bread and butter that keeps a home safe and running, panel upgrades, generator hookups, detector installs, and repairs that hold.

From the first call to the final walkthrough, your panel upgrades in Converse is handled by licensed, insured, background-checked techs who treat your home like their own.

What panel upgrades in Converse includes

  • 100 amp to 200 amp service upgrades
  • Panel and meter combo replacements
  • Federal Pacific and Zinsco panel replacement
  • Sub-panel installation for shops, additions, and pools
  • Whole-home surge protection added at the panel
  • Permit, utility coordination, and inspection handled

How does a panel upgrade in Converse move between the city and CPS Energy?

It runs on two tracks. The City of Converse permits and inspects the new panel under the 2023 National Electrical Code, the edition it has used for plan review since October 1, 2024. The meter side belongs to the utility, and the city's own site points residents to CPS Energy, so we confirm CPS Energy serves your address first.

CPS Energy routes a remodel that needs the power shut off to its Remodel department. Its steps also say it needs your permit and then the city's passed inspection before it turns on permanent service, and that it will otherwise leave the meter locked. We schedule the Converse inspection with the reconnect right behind it.

The 2023 code adds surge protection and an outside emergency disconnect on a replaced service. Converse's inspection guide for new homes asks for disconnects labeled Emergency Disconnect and Service Disconnect, and we label yours the same way.

Straight pricing

Free estimate. We come look at the panel, the meter, and the service, and give you a fixed price before anything starts.

FAQ

Panel Upgrades in Converse, answered

Straight answers. If you do not see yours, call us and ask.

Is a Federal Pacific panel really a problem?

Yes. Those breakers have a documented history of failing to trip under fault. That is a fire risk. Replacing it is one of the highest-value electrical upgrades you can make.

Do you charge extra to come out to Converse?

No trip-charge games. Converse is inside our service area, so you get straight flat-rate pricing on the work itself, quoted before we start.

Do you offer emergency electrical service in Converse?

We keep room for urgent calls in Converse. If you have a burning smell, a dead panel, or a real safety issue, call us and we will get to you as fast as we safely can.

Panel Upgrades in Converse, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote