Skip to content
Wattsmith Electric

EV Charger Installation | Comal County

EV Charger Installation in New Braunfels, TX

Level 2 charging done right, sized to your panel and your car. Serving New Braunfels and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Wattsmith Electric handles ev charger installation in New Braunfels with no guessing and no surprise invoices. Honest flat-rate work from a crew that shows up squared away.

New Braunfels is booming, and it shows in the work. New construction and additions on one side, historic downtown homes needing careful rewires on the other. We handle both, from rough-in to a delicate old-house panel swap.

You get one flat number for your New Braunfels project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.

What ev charger installation in New Braunfels includes

  • Level 2 240 volt charger installation, plug-in or hardwired
  • Dedicated circuit sized to the charger and the car
  • Load calculation to confirm panel capacity
  • Panel or sub-panel upgrade when capacity is short
  • Clean conduit runs across the garage or exterior
  • Permit and inspection where required

Can my New Braunfels panel carry a Level 2 EV charger?

Often it can, but we prove it with numbers before we promise. A Level 2 charger needs its own 240 volt circuit, so the first step is a load calculation on your panel to see whether the charger fits beside the air conditioning, the range and the dryer. When the panel is close to full, a load management device can sometimes stand in for a service upgrade.

The city requires a permit for work on any electrical system, so a new charger circuit gets a city inspection. The rebate list on New Braunfels Utilities' site covers thermostats, air conditioners, water saving items and solar, and names nothing for EV chargers, so there is no NBU charger rebate to plan around today. Homes on GVEC or PEC have their own rules, and we check those for your address. We also ask where you park, since the run from the panel to the garage wall shapes the work more than the charger does.

Straight pricing

Free estimate. We come look at the panel location, the charger, and the run, and give you a fixed price before anything starts.

FAQ

EV Charger Installation in New Braunfels, answered

Straight answers. If you do not see yours, call us and ask.

Should I get a plug-in or a hardwired charger?

Hardwired is cleaner and supports higher continuous output for most units. Plug-in is easier to swap later. We help you pick based on your car, your panel, and how fast you want to charge.

Are you licensed to work in New Braunfels?

Yes. We are a licensed and insured Texas electrical contractor and we pull the proper permits for work in New Braunfels wherever code requires it.

Do you actually service New Braunfels?

Yes. New Braunfels is part of our regular San Antonio metro service area. You get the same flat-rate pricing and the same crew that serves the rest of the region.

EV Charger Installation in New Braunfels, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote