Skip to content
Wattsmith Electric

Lighting Installation | Comal County

Lighting Installation in New Braunfels, TX

Recessed cans, ceiling fans, and landscape lighting placed with intent. Serving New Braunfels and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

New Braunfels homeowners call Wattsmith Electric for lighting installation. We find what others miss, price it flat, and do the work right the first time. Dependable from the first call.

New Braunfels is booming, and it shows in the work. New construction and additions on one side, historic downtown homes needing careful rewires on the other. We handle both, from rough-in to a delicate old-house panel swap.

We serve New Braunfels out of San Antonio with the same crew and the same flat-rate honesty we bring to every community in the metro. Your quote is your price.

What lighting installation in New Braunfels includes

  • Recessed can and canless LED layout and installation
  • Ceiling fan installation and fan-rated box replacement
  • Landscape and pathway lighting with transformers and timers
  • Under-cabinet, cove, and accent lighting
  • Dimmer and smart switch installation
  • Fixture swaps, chandeliers, and high-ceiling work

Does new lighting in New Braunfels need a permit?

It turns on whether the wiring changes. The city says replacing a light fixture needs no permit when you are not altering or replacing wiring, so hanging a new pendant or a ceiling fan on an existing fan rated box usually stays outside the permit process. Recessed cans, a new switch location or a circuit for landscape lights change the wiring, and those go through the Building Division.

In a newer home with drywall ceilings, recessed lights are usually simpler to fit than in an old plaster ceiling, and the Census puts the city's median home at 2006. Outdoors, every new exterior circuit gets GFCI protection and fixtures rated for wet locations, and we aim landscape lights down at what you want lit rather than at the neighbors. We found no outdoor lighting ordinance on the city's own site, but a neighborhood association may set rules on fixture style or color, so check yours before we order.

Straight pricing

Lighting is quoted flat by scope. We count the fixtures, the switching, and the access, then give you one price.

FAQ

Lighting Installation in New Braunfels, answered

Straight answers. If you do not see yours, call us and ask.

How many recessed lights do I need in a room?

It depends on ceiling height, room size, and what the room is for. We lay it out so the light is even, not a random scatter of cans. You see the plan before we cut a hole.

Are you licensed to work in New Braunfels?

Yes. We are a licensed and insured Texas electrical contractor and we pull the proper permits for work in New Braunfels wherever code requires it.

Do you actually service New Braunfels?

Yes. New Braunfels is part of our regular San Antonio metro service area. You get the same flat-rate pricing and the same crew that serves the rest of the region.

Lighting Installation in New Braunfels, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote