Panel Upgrades | Guadalupe County
Panel Upgrades in Cibolo, TX
100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving Cibolo and the San Antonio metro.
- Licensed and Insured
- BBB Accredited
- Veteran Owned
- TECL 41806
5.0 on Google, 11 reviewsas of October 2, 2026
Electrical emergency? Call now.
Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.
Wattsmith Electric handles panel upgrades in Cibolo with no guessing and no surprise invoices. Honest flat-rate work from a crew that shows up squared away.
Cibolo filled up fast with newer family homes, and those families are adding EV chargers, hot tubs, and generators. We size the panel for it, wire it clean, and make sure the additions do not overload what the builder installed.
You get one flat number for your Cibolo project, approved before we lift a tool. No hourly meter, no surprise line items, and that is how we earn repeat calls.
What panel upgrades in Cibolo includes
- 100 amp to 200 amp service upgrades
- Panel and meter combo replacements
- Federal Pacific and Zinsco panel replacement
- Sub-panel installation for shops, additions, and pools
- Whole-home surge protection added at the panel
- Permit, utility coordination, and inspection handled
How does a panel or service upgrade line up with GVEC in Cibolo?
A Cibolo panel upgrade is two pieces of work that have to meet: the panel and service entrance, which the city inspects, and the meter, which belongs to the electric provider. The city names GVEC as its primary provider, so for most addresses the meter side runs through the cooperative, and we confirm that for your street before anything is scheduled.
For new service, GVEC asks for the size of service and whether it runs overhead or underground. An upgrade is a different request, so we get GVEC's steps for your address early and your house is not left waiting on the meter. The city schedules inspections through MGO Connect and works from the 2023 National Electrical Code. Because the median Cibolo home was built in 2008, age is rarely the reason to upgrade here. New load usually is: a charger, a shop or a pool added to a service sized for the house as first built.
Straight pricing
Free estimate. We come look at the panel, the meter, and the service, and give you a fixed price before anything starts.
Nearby
Panel Upgrades in other areas
More in Cibolo
Other services in Cibolo
Reviews
5.0 on Google, 11 reviewsas of October 2, 2026
FAQ
Panel Upgrades in Cibolo, answered
Straight answers. If you do not see yours, call us and ask.
Do I need a 200 amp panel?
If you are adding an EV charger, electric heat, or a large addition, almost always yes. We size the service to your real loads plus room to grow, not a guess.
How fast can you get to Cibolo?
For most calls in Cibolo we can offer same-day or next-day service during business hours. Call and we will give you the soonest honest window.
Can you handle both my home and my rental in Cibolo?
Absolutely. We work with homeowners and landlords across Cibolo, from a single repair to a full panel upgrade or a turn between tenants.
Panel Upgrades in Cibolo, quoted flat
Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.
- Licensed and Insured
- BBB Accredited
- Flat-Rate Pricing
- Background-Checked