Skip to content
Wattsmith Electric

Electrical Inspections | Comal County

Electrical Inspections in New Braunfels, TX

A clear read on what is safe, what is not, and what it takes to fix it. Serving New Braunfels and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Need electrical inspections in New Braunfels? Wattsmith Electric quotes the number before we start, then does the work to code. Flat-rate pricing, no hourly meter.

New Braunfels is booming, and it shows in the work. New construction and additions on one side, historic downtown homes needing careful rewires on the other. We handle both, from rough-in to a delicate old-house panel swap.

Every electrical inspections job in New Braunfels gets the Wattsmith Standard: on time, flat rate before work starts, a clean job site, and code-right work or we make it right.

What electrical inspections in New Braunfels includes

  • Panel, breaker, and service inspection
  • Grounding and bonding verification
  • Outlet, GFCI, and AFCI testing
  • Wiring type and condition assessment
  • Buyer and seller pre-sale inspections
  • Prioritized written report with photos

What does a home electrical inspection in New Braunfels look at?

It looks at the panel, the service and grounding, a sample of outlets and switches, GFCI and AFCI protection, smoke alarm circuits and any sign of overheating, and you get a written report. Where we spend the most time depends on the age of the house. Census estimates show about 40 percent of New Braunfels homes were built in 2010 or later, and in those the focus is usually on later additions such as a hot tub, a shop or a charger.

In the roughly 8,800 homes built before 1980, the list grows: original panels, ungrounded outlets, aluminum or cloth wire, and changes made without a permit. A buyer, a seller and an insurer may each want something different, so tell us why you need the report. This is our own review of the home, separate from the city's permit inspections and from the meter loop inspections NBU runs before it connects service.

Straight pricing

Inspections are a flat fee with a written report. Any repairs we recommend come with their own flat quote, no pressure.

FAQ

Electrical Inspections in New Braunfels, answered

Straight answers. If you do not see yours, call us and ask.

What do you check in an electrical inspection?

The service and panel, grounding and bonding, wiring type and condition, and the devices throughout. We test GFCI and AFCI protection and document everything with photos in a written report.

What is in the report?

Every item we check is rated Safety, Repair, Maintenance, Pass or Not present. Findings carry labeled photos and go into a priority action plan, most urgent first, with a flat price for any correction.

Do you actually service New Braunfels?

Yes. New Braunfels is part of our regular San Antonio metro service area. You get the same flat-rate pricing and the same crew that serves the rest of the region.

Are you licensed to work in New Braunfels?

Yes. We are a licensed and insured Texas electrical contractor and we pull the proper permits for work in New Braunfels wherever code requires it.

Electrical Inspections in New Braunfels, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote