Skip to content
Wattsmith Electric

Panel Upgrades | Bexar County

Panel Upgrades in Stone Oak, TX

100 amp to 200 amp is our specialty. Permitted, inspected, and built to code. Serving Stone Oak and the San Antonio metro.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

Electrical emergency? Call now.

Burning smell, sparks, a dead panel, or a real safety risk. Call and we move.

Need panel upgrades in Stone Oak? Wattsmith Electric quotes the number before we start, then does the work to code. Flat-rate pricing, no hourly meter.

Stone Oak homes are newer, but a two-story house with a media room, a pool, and two EVs asks more of a panel than the builder planned for. We add capacity, wire chargers clean, and handle the surge protection these all-electric homes need.

Every panel upgrades job in Stone Oak gets the Wattsmith Standard: on time, flat rate before work starts, a clean job site, and code-right work or we make it right.

What panel upgrades in Stone Oak includes

  • 100 amp to 200 amp service upgrades
  • Panel and meter combo replacements
  • Federal Pacific and Zinsco panel replacement
  • Sub-panel installation for shops, additions, and pools
  • Whole-home surge protection added at the panel
  • Permit, utility coordination, and inspection handled

How does CPS Energy fit into a panel upgrade in Stone Oak?

CPS Energy owns the meter, and the City of San Antonio inspects everything on your side of it. For a Stone Oak upgrade, Development Services issues the electrical permit through BuildSA, its application asks whether work with CPS is required, and CPS wants the city's passed inspection before it turns on permanent service.

If that inspection is not in yet, CPS Energy says it will set the electric meter in a locked position until it is. We line up the city visit and the utility visit so your house is not stuck between them. About 69 percent of housing units in the Stone Oak ZIP codes 78258 and 78259 were built in 2000 or later, so here the reason to upgrade is usually new load, such as a charger or a pool, rather than an aging panel. The National Electrical Code San Antonio adopts calls for a surge protective device and an outside emergency disconnect on a replaced service, and both go into our plan from day one.

Straight pricing

Free estimate. We come look at the panel, the meter, and the service, and give you a fixed price before anything starts.

FAQ

Panel Upgrades in Stone Oak, answered

Straight answers. If you do not see yours, call us and ask.

Do I need a 200 amp panel?

If you are adding an EV charger, electric heat, or a large addition, almost always yes. We size the service to your real loads plus room to grow, not a guess.

Can you handle both my home and my rental in Stone Oak?

Absolutely. We work with homeowners and landlords across Stone Oak, from a single repair to a full panel upgrade or a turn between tenants.

How fast can you get to Stone Oak?

For most calls in Stone Oak we can offer same-day or next-day service during business hours. Call and we will give you the soonest honest window.

Panel Upgrades in Stone Oak, quoted flat

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote